Description:
With the upcoming construction of the I-89 Exit 14 bicycle-pedestrian bridge in South Burlington, a major impediment to active transportation in the Chittenden County region will be addressed. However, the bridge project is limited to only the bridge and landings and does not include connections to existing and planned active transportation infrastructure. The City of South Burlington initiated the Bike/Pedestrian Bridge over I-89 Connections project to identify priority improvements to connect people and places in the areas surrounding the I-89 bridge. Due to other concurrent studies that addressed most locations in this project, the study concluded by offering conceptual recommendations for further consideration at two sites: Williston Road: Interchange to Jughandle and Quarry Hill/Spear Intersection.
Consultant:
Toole Design Group
Geography:
Burlington, South Burlington