Search Studies and Reports:

Reset All

Campus Connector Road ~ Final Scoping Report

63.9 MB
Year:
2005
Theme:
New Capacity, Transportation
Description:
This Scoping Report has been prepared for the Chittenden County Metropolitan Planning Organization (CCMPO) and the Town of Colchester by McFarland-Johnson (MJ). MJ was retained by the CCMPO to provide Phase A (Scoping) design services for the Campus Connector Road in the Town of Colchester, Vermont.
Consultant:
Inc., McFarland-Johnson
Geography:
Colchester