Search Studies and Reports:

Reset All

South Burlington 2019 EV Fleet Guidance

347.1 kB
Year:
2019
Theme:
Energy
Description:
A summary of fleet efficiency options and brief analysis of potential costs and benefits of switching out to more efficient vehicles, including plug-in electric vehicle (EV) options, is included below.
Consultant:
VEIC
Geography:
South Burlington

North Williston Rd/Mountain View Rd Multi-Way Stop Warrant Analysis

735.3 kB
Year:
2018
Theme:
Traffic, Transportation
Description:
This analysis evaluated the MUTCD guidance, commonly referred to as warrants, as it pertains to the installation of multi-way stop control at the intersection of North Williston Road and Mountain View Road. It can also be found as an appendix to the North Williston Road Scoping Study.
Consultant:
Resource Systems Group Inc.
Geography:
Williston

Economic and Technical Analysis of Key Employee Commute TDM Strategies

751.4 kB
Year:
2016
Theme:
Transit, Transportation Demand Management
Description:
This project allowed the City of Burlington to study in more detail the economic costs, technological issues, and other details and logistics associated with the design and implementation of a Universal/Unlimited Access Transit Pass program, and a complementary Parking-Cash Out/ Commute Allowance Program for City employees, as two recommended strategies from the 2015 Transportation Demand Management (TDM) Action Plan.
Consultant:
(none)
Geography:
Burlington

Bayside Build-Out Land Use Analysis

445.6 kB
Year:
2015
Theme:
Buildout, Intersection, Land Use, New Capacity, Traffic, Transportation
Description:
CCRPC staff worked with Town staff to evaluate multiple transportation alternatives in order to improve capacity at the Bayside Park intersection. Alternatives 3B and 4B were the alternatives recommended for land use analysis. The purpose of the land use analysis was to determine the amount of development (in terms of new dwelling units and commercial floor area) that could occur given the increased capacity and additional trips that could be accommodated through the Bayside Park intersection as a result of the transportation improvements. This memo also estimates tax revenue associated with the additional development for Alternative 3B.
Consultant:
(none)
Geography:
Colchester

Bayside Build-Out Traffic Analysis

1.9 MB
Year:
2015
Theme:
Buildout, Intersection, New Capacity, Traffic, Transportation
Description:
The Town of Colchester requested CCRPC staff expertise in evaluating congestion and examining alternatives for improvement at the Bayside Park signalized intersection. Alternatives focused on congestion reduction while also attempting to increase land-use connectivity between Bayside Park and Bayside Beach
Consultant:
(none)
Geography:
Colchester

Neighbor Rides Final Report 2015

61.1 kB
Year:
2015
Theme:
Transit
Description:
Neighbor Rides, a program of the United Way of Chittenden County, is a multi-sector collaborative that utilizes volunteer drivers to supplement contracted vans and sedans to increase capacity across the existing para-transit system. This report summarizes the tasks and accomplishments for FY 2015.
Consultant:
(none)
Geography:
Chittenden County

Speed Analysis & Traffic Counts within the vicinity of River Road

1.8 MB
Year:
2011
Theme:
Infrastructure, Safety, Speed, Technical Assistance, Traffic, Transportation
Description:
At the request of the Town of Colchester, CCRPC conducted three traffic counts in the vicinity of River Road & Red Oak Drive, at the location of a crash incident which occurred during August of 2011
Consultant:
(none)
Geography:
Colchester

Multi-way Stop Analysis for Woods Hollow Rd. Intersections (Phelps Rd. & Maple Tree Ln.)

61.6 kB
Year:
2011
Theme:
Infrastructure, Safety, Technical Assistance, Traffic, Transportation, Warrant Analysis
Description:
2011 Review of multi-way stop warrants for the Woods Hollow Road & Phelps Rd. intersection, and Woods Hollow Rd. & Maple Tree Lane. The 2009 MUTCD Multiway Stop criteria are not met.
Consultant:
(none)
Geography:
Westford

US 7/Marsett Road/Bostwick Road Intersection Safety Analysis

2.1 MB
Year:
2011
Theme:
Infrastructure, Intersection, Safety, Technical Assistance, Traffic, Transportation
Description:
The Town of Shelburne requested the Chittenden County Metropolitan Planning Organization’s (CCMPO) assistance in reviewing and analyzing the crash history at the US 7 /Marsett Road/Bostwick Road intersection. The Shelburne Police have seen an increase in the number of crashes over the past year and would like to determine possible causes and mitigation strategies.
Consultant:
(none)
Geography:
Shelburne

Ferry/Lake Road Multi-Way Stop Warrant

65.4 kB
Year:
2010
Theme:
Technical Assistance, Transportation, Warrant Analysis
Description:
2009 Review of relevant multi-way stop warrants for the Ferry and Lake Road intersection. At that time a multi-way stop was not warranted.
Consultant:
(none)
Geography:
Charlotte