Search Studies and Reports:

Reset All

Checkerberry Sidewalk Scoping Study Report

6.5 MB
Year:
2025
Theme:
Pedestrian, scoping, Sidewalk
Description:
CCRPC worked with the Town of Milton and consultant Hoyle Tanner to facilitate the development of a missing +-700’ section of sidewalk along Route 7 and West Milton Road from Nancy Drive to Field Ridge Drive. This missing section of sidewalk is an important connection between the Checkerberry and Downtown areas of Milton. The project consulted the community to develop and select preferred designs for the missing sidewalk.
Consultant:
Hoyle - Tanner & Associates
Geography:
Milton