Year:
1993
Theme:
Infrastructure, Municipal Planning, Transportation
Description:
This document is an addition to the Colchester Alternative Plan which investigates the possibility of reconditioning the causeway and crossing the "cut" with a 10' wide bicycle and pedestrian path.
Consultant:
FitzPatrick-Lleweeln Inc.
Geography:
Colchester