Description:
A feasibility study for sidewalk improvements along Park Street and VT Route 15 from Park Street to Meadow Lane. The pre-existing sidewalk that extends along the east side of VT Route 15 between Park Street and the fire station was in very poor condition and needs to be replaced. In addition to evaluating the replacement of this existing sidewalk, the Selectboard requested an evaluation of new sidewalk installation from the fire station to Meadow Lane.
Consultant:
Donald L. Hamlin Consulting Engineers Inc.
Geography:
Underhill