Search Studies and Reports:

Reset All

Church Street Marketplace Pedestrian & Streetscape Assessment

24.4 MB
Year:
2017
Theme:
Infrastructure, Pedestrian
Description:
This assessment includes a general evaluation of the current Marketplace existing conditions identifying areas in need of maintenance, as well as conceptual reconstruction plans for the Church and Bank Streets intersection and the Church and College Streets intersection.
Consultant:
DuBois & King Inc.
Geography:
Burlington

Winooski River Bicycle and Pedestrian Bridge Technical Feasibility Study

23.7 MB
Year:
2017
Theme:
Bike and Ped, Transportation
Description:
This study evaluated alternatives for a new bicycle/pedestrian bridge over the Winooski River connecting the cities of Burlington and Winooski. The issues examined for each alternative included permitting feasibility, project design and cost, right-of-way impacts, and utility conflicts. A comprehensive scoping study of the preferred alignment may be warranted depending on the outcome of a 2017/2018 scoping study of the Main Street Bridge over the Winooski River.
Consultant:
DuBois & King Inc.
Geography:
Burlington, Winooski

VT 117/North Williston Road Scoping Study

18.1 MB
Year:
2015
Theme:
Intersection, Resiliency, Storm Water, Traffic
Description:
This study was one of several conducted as part of the CIRC Alternatives process.  It examined traffic alternatives at the intersection and flood resiliency improvements to North Williston Road.
Consultant:
DuBois & King Inc.
Geography:
Essex, Williston

Bicycle and Pedestrian Plan: Town of Essex/Village of Essex Junction

19.4 MB
Year:
2015
Theme:
Bicycle & Pedestrian, Transportation
Description:
This Plan represents a unified Town/Village bicycle$B!>(Bpedestrian plan that connects the entire community. It assesses the existing network, and identifies and prioritizes future needs so that the Town and Village can pursue implementation opportunities as they arise. This project considers updated design approaches; there have been many recent innovations in bicycle and pedestrian design, many of which may be applicable to the Town and Village and result in a more cost effective and easily implemented network.
Consultant:
DuBois & King Inc.
Geography:
Essex, Essex Junction

US Route 7/Ferry Road Pedestrian Crossing Feasibility Study

1.7 MB
Year:
2014
Theme:
Bicycle & Pedestrian, Intersection, Technical Assistance, Transportation
Description:
This study explored alternatives and developed recommendations to improve pedestrian safety at the intersection of US Route 7, Ferry Road and Church Hill Road in Charlotte, particularly for those crossing US Route 7 to travel between Charlotte’s West Village and the CCTA stop in the southeast quadrant of the intersection.
Consultant:
DuBois & King Inc.
Geography:
Charlotte

Vermont Route 116 Corridor Study

13.3 MB
Year:
2014
Theme:
Corridor, Transportation
Description:
This study is a comprehensive evaluation of Route 116 through Hinesburg’s growth center, and includes all modes of transportation. It examines the opportunities for accommodating planned village growth and addressing current traffic congestion through enhancements in street connectivity. It also evaluates opportunities to maximize alternative modes of transportation, and provide more efficient alternative routes for local circulation.
Consultant:
DuBois & King Inc.
Geography:
Hinesburg

Vermont Route 116 Corridor Study – Attachments

2.2 MB
Year:
2014
Theme:
Corridor, Transportation
Description:
This study is a comprehensive evaluation of Route 116 through Hinesburg’s growth center, and includes all modes of transportation. It examines the opportunities for accommodating planned village growth and addressing current traffic congestion through enhancements in street connectivity. It also evaluates opportunities to maximize alternative modes of transportation, and provide more efficient alternative routes for local circulation.
Consultant:
DuBois & King Inc.
Geography:
Hinesburg

US 2 Multimodal Transportation Scoping Study

45.8 MB
Year:
2014
Theme:
Bicycle & Pedestrian
Description:
Bike/Ped improvements along US RT 2 from Taft Corners to North Williston Road.
Consultant:
DuBois & King Inc.
Geography:
Williston

Crescent Connector Project: Environmental Assessment

24 MB
Year:
2014
Theme:
Corridor, Traffic, Transportation
Description:
The Environmental Assessment (EA) identifies, analyzes and discusses the potential environmental, cultural, and socioeconomic effects associated with the construction of the Crescent Connector Project in the Village of Essex Junction, Vermont.
Consultant:
DuBois & King Inc., Resource Systems Group Inc.
Geography:
Essex Junction