Route 116 Hinesburg Village Corridor

18 MB
Year:
2004
Theme:
Transportation
Description:
The purpose of this study was to: identify and evaluate physical and functional deficiencies along a 1.5 mile Route 116 roadway corridor between Shelburne Falls Road on the north and Buck Hill Road on the south; document potential solutions and constraints; and develop base plans for further project development.
Consultant:
DuBois & King Inc.
Geography:
Hinesburg

I-89 Urban Transportation Improvements

67.6 MB
Year:
2003
Theme:
Corridor, Transportation
Description:
This study analyzed several potential improvements to the I-89 corridor between Exits 12 and 15, including the Exit 12B interchange. While the study was initiated as an Environmental Assessment, it stopped well short of this and recommendations were made to proceed separately with several individual projects. Traffic projections and environmental screening were performed including potential wetland and archaeological impacts within or near the Interstate right of way (ROW), as well as potential air and noise impacts.
Consultant:
DuBois & King Inc., Resource Systems Group Inc.
Geography:
South Burlington, Williston

Route 127 Corridor Study: Colchester, Vermont – Final Report

7.1 MB
Year:
1998
Theme:
Corridor, Infrastructure, Transportation
Description:
The purpose of this study was to identify and evaluate physical and functional deficiencies along the east-west Route 127 highway corridor through the town of Colchester, to document potential solutions and constraints, and to develop an implementation plan for further project development.
Consultant:
DuBois & King Inc.
Geography:
Colchester

I-89/Hinesburg Road Off-Ramp Conceptual Design Report

1.9 MB
Year:
1996
Theme:
Corridor, Intersection, Traffic, Transportation
Description:
The Chittenden County area of Vermont is continuing to experience commercial, industrial and residential growth, much of which is occurring in the City of South Burlington. The City has zoned most of the area to the northeast of the VT 116 overcrossing of I-89 for mixed commercial and industrial use. This area has seen the demise of the former Digital Plant and its subsequenpt artial revival. Most of the potential of this areah as not been realizedbecauseo f a lack of access. To remedy this, the City has undertaken two initiatives. The first is an interchange from I-89 to VT 116 and the second,s ome local accessin to the arean ear Technology Park (the former Digital Plant).
Consultant:
DuBois & King Inc.
Geography:
South Burlington