Search Studies and Reports:

Reset All

North Williston Rd/Mountain View Rd Multi-Way Stop Warrant Analysis

735.3 kB
Year:
2018
Theme:
Traffic, Transportation
Description:
This analysis evaluated the MUTCD guidance, commonly referred to as warrants, as it pertains to the installation of multi-way stop control at the intersection of North Williston Road and Mountain View Road. It can also be found as an appendix to the North Williston Road Scoping Study.
Consultant:
Resource Systems Group Inc.
Geography:
Williston

Chittenden County Year 2000 Transportation Survey

918.5 kB
Year:
2017
Theme:
Survey
Description:
A 2000 survey of the public's attitudes and opinions on transportation and related topics
Consultant:
Resource Systems Group Inc.
Geography:
Chittenden County

Burlington Transportation Demand Management Action Plan

4 MB
Year:
2015
Theme:
Transportation Demand Management
Description:
This plan presents short and long-term transportation demand management (TDM) recommendations for the City of Burlington--as an employer--to help staff reduce congestion, encourage healthy choices, reduce harmful vehicle emissions, and reduce downtown parking demand. A secondary goal of this Action Plan is to provide a model for other employers and employees in downtown Burlington interested in reducing their transportation and parking impacts.
Consultant:
Resource Systems Group Inc.
Geography:
Burlington

Jericho Transportation Study

5.4 MB
Year:
2015
Theme:
Transportation
Description:
The 2015 Jericho Transportation Study is an update to the 2004 Jericho Transportation Study and assesses the existing transportation system, estimates future traffic conditions based on anticipated land use, future development, and estimated traffic generation, and presents a capital plan.
Consultant:
Resource Systems Group Inc.
Geography:
Jericho

Jericho Transportation Study Appendix

6 MB
Year:
2015
Theme:
Transportation
Description:
This Appendix to the 2015 Jericho Transportation Study includes future development trip distribution, intersection analysis, intersection auxiliary lane warrant summaries, PAVER analysis, pavement management system analysis, transportation funding sources, and culvert inventory details.
Consultant:
Resource Systems Group Inc.
Geography:
Jericho

Jericho Bicycle and Pedestrian Facility Master Plan

2.8 MB
Year:
2015
Theme:
Bicycle & Pedestrian
Description:
The 2015 Jericho Bicycle and Pedestrian Facility Master Plan investigates and assesses the existing bicycle and pedestrian network, evaluates future conditions, and presents a list of recommendations for capital planning. This Plan is a supplement to the 2015 Jericho Transportation Study.
Consultant:
Resource Systems Group Inc.
Geography:
Jericho

Jericho Bicycle and Pedestrian Facility Master Plan Appendix

10.9 MB
Year:
2015
Theme:
Bicycle & Pedestrian
Description:
This Appendix to the 2015 Jericho Bicycle and Pedestrian Facility Master Plan includes natural and cultural resource maps, transportation funding table, bicycle/pedestrian facility maps (sidewalks & paths, trails, desired connections), model bike/ped land use regulations, complete streets information, and a complete sidewalk inventory. The 2015 Jericho Bicycle and Pedestrian Facility Master Plan and Appendix complement the 2015 Jericho Transportation Study.
Consultant:
Resource Systems Group Inc.
Geography:
Jericho

Essex Junction Train Station Access and Circulation Study

13.4 MB
Year:
2015
Theme:
Infrastructure, Safety, Traffic, Transit
Description:
This Scoping Study evaluating possible improvements to the Amtrak Train Station in Essex Junction and evaluated access and circulation improvements in the station area.
Consultant:
Resource Systems Group Inc.
Geography:
Essex Junction

Pearl Street/Prospect Street/Colchester Avenue Intersection Scoping Study

27.6 MB
Year:
2014
Theme:
Intersection, Traffic, Transportation
Description:
The Pearl Street/Prospect Street/Colchester Avenue Intersection Scoping Study was conducted to evaluate alternatives that address safety, mobility, and operational issues at the Pearl Street/Prospect Street /Colchester Avenue intersection in Burlington, Vermont.
Consultant:
Resource Systems Group Inc.
Geography:
Burlington

Hinesburg Sidewalk Scoping

3.5 MB
Year:
2014
Theme:
Bicycle & Pedestrian, Environment, Municipal Planning, Sidewalk, Transportation
Description:
CCRPC hired Resource Systems Group (RSG) for a feasibility study of key future sidewalk segments in Hinesburg’s Village Growth Area. The scoping study evaluated four of the Town’s top seven priority sidewalk locations. The work was undertaken on 2014 and the scoping report completed in December
Consultant:
Resource Systems Group Inc.
Geography:
Hinesburg