Search Studies and Reports:

Reset All

Chittenden County Intelligent Transportation Systems – Strategic Deployment Plan

849.1 kB
Year:
2000
Theme:
ITS, Transportation, Western Corridor
Description:
The FHWA has established the National ITS Architecture to ensure that ITS investments are compatible and conform to national standards. Further, FHWA has set forth a standard planning process for developing regional ITS deployment plans. The CCMPO ITS Deployment Plan is consistent with the National Architecture.
Consultant:
Resource Systems Group Inc., University of Vermont
Geography:
Chittenden County

Burlington Waterfront Study Update

840.5 kB
Year:
2000
Theme:
Parking, Traffic, Transportation
Description:
The purpose of the parking study was to assess the key characteristics of parking demand at the Waterfront so that we can accurately estimate future conditions.
Consultant:
Resource Systems Group Inc.
Geography:
Burlington

Analysis of Through Traffic Mitigation Alternatives: Proctor/Hadley/Meadow Neighborhood, South Burlington

110.4 kB
Year:
1999
Theme:
Technical Assistance, Transportation
Description:
This study summarizes alternatives proposed to remove through traffic from the Proctor / Meadow / Hadley Neighborhood located on the east side of US 7 just north of I-189. The neighborhood streets serve as a shortcut between US 7 and Swift Street. Based on a license plate survey conducted by Resource Systems Group (RSG), it was found that approximately 80 to 85% of the traffic in the neighborhood is cut though traffic.
Consultant:
Resource Systems Group Inc.
Geography:
South Burlington

Burlington / Essex Passenger Rail Feasibility Study and Corridor Analysis

7.4 MB
Year:
1999
Theme:
Rail, Transit, Transportation
Description:
CCMPO engaged a team of consultants led by R.L. Banks & Associates, Inc., (RLBA) to assist CCMPO in determining the feasibility of passenger rail service in the Burlington-Essex corridor, assuming it operates as an extension of the Charlotte-Burlington passenger rail project. This report describes the analysis accomplished, as well as the conclusions and recommendations of the consultant.
Consultant:
Executype Services, R.L. Banks & Associates Inc., Resource Systems Group Inc.
Geography:
Burlington, Colchester, Essex, Essex Junction, Winooski

ABRB Passenger Service Study

40.6 MB
Year:
1998
Theme:
Rail, Transportation, Western Corridor
Description:
Feasibility study for establishing passenger rail service along the Vermont Western Corridor
Consultant:
Clough Harbour & Associates LLP, LS Transit Systems Inc., Resource Systems Group Inc.
Geography:
State

Land Use Allocation

165.2 kB
Year:
1995
Theme:
Land Use, Modeling
Description:
Documentation for the Land Use Allocation Model for CCRPC & CCMPO.
Consultant:
Resource Systems Group Inc.
Geography:
Chittenden County

Traffic Impacts of Champlain Parkway Detour on Pine Street

3.5 MB
Year:
1994
Theme:
Infrastructure, Traffic, Transportation
Description:
This study addresses the traffic impacts of diverting the Park Way corridor along Pine Street from Lakeside Avenue to the BPW garage or to Main Street. As part of this assessment, a new traffic demand model was calibrated and run for the 2003 no build and build scenarios. Traffic was distributed onto the local road network, and the level-of-s~rvice results are presented which assess potential areas of congestion. Road improvements are then suggested to alleviate that congestion. This report presents a brief summary of the results of the modeling analysis.
Consultant:
Resource Systems Group Inc.
Geography:
Burlington, South Burlington

The Traffic Calming Pilot Study for a Neighborhood in Burlington’s Old North End

3.1 MB
Year:
1993
Theme:
Infrastructure, Safety, Speed, Traffic, Transportation
Description:
This study is part of a four part Traffic Engineering and Transportation Planning Services effort including: a Traffic Calming Strategy for the Burlington Old North End, a City Wide study for Development of Truck Routes, a Revision of the Downtown Parking Study, and a Regional Congestion Management Strategy.
Consultant:
Resource Systems Group Inc., T.J. Boyle & Associates
Geography:
Burlington

Winooski Alternative Transportation Path Master Plan

1.9 MB
Year:
1993
Theme:
Infrastructure, Municipal Planning, Transportation
Description:
The purpose of this plan is to provide a network of paths, sidewalks, and bicycle routes that will provide a safe and efficient alternative to the current automobile dependent transportation system within Winooski, VT. This system is developed to encourage non-motorized modes and multi-modal links of transportation. The emphasis of this plan is to provide utilitarian connections between the neighborhoods and communities within the city and to city activity centers.
Consultant:
FitzPatrick-Lleweeln Inc., Resource Systems Group Inc., T.J. Boyle & Associates
Geography:
Winooski

Burlington Alternative Transportation Path Master Plan

6.8 MB
Year:
1993
Theme:
Infrastructure, Municipal Planning, Transportation
Description:
The purpose of this plan is to provide a network of paths, sidewalks, and bicycle routes that will provide a safe and efficient alternative to the current automobile dependent transportation system within the City of Burlington. This system is developed to encourage non-motorized modes and multi-modal links of transportation. The emphasis of this plan is to provide utilitarian connections between the neighborhoods and communities within the city and to city activity centers.
Consultant:
FitzPatrick-Lleweeln Inc., Resource Systems Group Inc., T.J. Boyle & Associates
Geography:
Burlington