Search Studies and Reports:

Reset All

Williston Traffic Signal System Assessment Study

8.3 MB
Year:
2019
Theme:
ITS, Traffic Signal
Description:
This study evaluated traffic signal systems for four intersections along Marshall Avenue in Williston with respect to condition and compliance with current state and federal design standards.  Recommended high-priority, medium-priority and low-priority improvements were identified including probable upgrade cost estimates depending on the existing conditions and functionality of the current signals system.
Consultant:
Stantec
Geography:
Williston

Essex Junction Parking Study

3.4 MB
Year:
2019
Theme:
Parking
Description:
An examination of current and future parking needs in the Village.
Consultant:
Stantec
Geography:
Essex Junction

Colchester Avenue/Riverside Avenue Scoping Report

35.4 MB
Year:
2019
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This is a scoping report for the intersections of Colchester Avenue, Riverside Avenue, Barrett Street, and Mill Street located in Burlington. It was conducted and coordinated with a separate scoping study of the adjacent Winooski River Bridge.
Consultant:
Hartgen Archaeological Associates, MTJ Roundabout Engineering, Stantec
Geography:
Burlington

VT Route 15 Sidewalk / Path Study, Athens to VT Route 289

7.1 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The Chittenden County Regional Planning Commission (CCRPC), working with the Town of Essex, the Village of Essex Junction, and Stantec Consulting Services, Inc. developed a scoping study evaluating sidewalk/path improvements for VT Route 15 between Athens Drive and VT Route 289. The goal of the scoping project was to identify options for an important missing link between the Town and Village pedestrian and bicycle network.
Consultant:
Stantec
Geography:
Essex, Essex Junction

VT Route 15 Bicycle/Pedestrian Improvements Study, Susie Wilson Road to West Street Extension

5.6 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The Chittenden County Regional Planning Commission (CCRPC), working with the Village of Essex Junction, the Town of Essex, and Stantec Consulting Services Inc. updated a scoping study completed in 2013 for bicycle and pedestrian improvements to VT Route 15 from Exit 15 to West Street Extension. This update looks more closely at the section between Susie Wilson Road and West Street Extension.
Consultant:
Stantec
Geography:
Essex, Essex Junction

Chamberlin Lane and Brennan Woods Drive Traffic Calming Study

2.8 MB
Year:
2018
Theme:
Traffic Calming
Description:
This study investigated existing traffic conditions and addressed residents' concerns regarding vehicular speeds along Chamberlin Lane and Brennan Woods Dr., and recommended necessary traffic calming measures.
Consultant:
Stantec
Geography:
Williston

I-89 Exit 14 Alternative Transportation Crossing Study Appendices

6.5 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The I-89 Exit 14 Alternative Transportation Crossing Study was undertaken to identify a means and alignment to improve pedestrian and bicycle access in the Exit 14 area.
Consultant:
Stantec
Geography:
South Burlington

I-89 Exit 14 Alternative Transportation Crossing Study

5.7 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The I-89 Exit 14 Alternative Transportation Crossing Study was undertaken to identify a means and alignment to improve pedestrian and bicycle access in the Exit 14 area.
Consultant:
Stantec
Geography:
South Burlington