City Center Parking & Movement Plan

6.8 MB
Year:
2020
Theme:
Parking
Description:
This study outlines a phased parking strategy and mobility recommendations for the City Center area of the City of South Burlington, Vermont. The study area focuses on development and redevelopment along Market Street, Garden Street, and adjacent areas served by Williston Road and Dorset Street.
Consultant:
Stantec
Geography:
South Burlington

Marshall Avenue Shared Use Path Connection, Williston

11.4 MB
Year:
2020
Theme:
Bicycle & Pedestrian
Description:
The purpose of this project is to provide a safe, visible, comfortable, convenient, and direct bicycle and pedestrian facility connecting existing and planned facilities in Williston and South Burlington. The project is to provide for pedestrians and bicyclists of various ages and abilities, while maintaining safe and efficient vehicular conditions along Marshall Avenue.
Consultant:
Stantec
Geography:
Williston

Lake Street Pedestrian Streetscape and Stormwater Feasibility Study

10 MB
Year:
2020
Theme:
Bike/Ped, Bike/Pedestrian, Stormwater
Description:
Lake Street in Burlington is a shared use street that connects the City core to the northern waterfront. There are two mid-block pedestrian crossings on this segment. The road is landscaped with street trees and granite blocks. Stormwater runoff sheet flows across the road from east to west. Runoff from nearby properties drains over Lake Street at the driveway intersections. Most of the stormwater sheet flows into small swales or ponds in the nearest low spot. The City with funding from the CCRPC studied possible pedestrian, streetscape and stormwater improvements for Lake Street in the project area.
Consultant:
Stantec
Geography:
Burlington

Packard Road and Raceway Road Paving Analysis Study

4.3 MB
Year:
2020
Theme:
Pavement, Paving Analysis
Description:
The purpose of the study is to perform a planning level analysis for the concept of paving two existing gravel surface roads; Packard Road and Raceway Road in Jericho, and develop a strategic phased paving plan to incorporate in the Town's annual budget and planning.
Consultant:
Stantec
Geography:
Jericho

Williston Traffic Signal System Assessment Study

8.3 MB
Year:
2019
Theme:
ITS, Traffic Signal
Description:
This study evaluated traffic signal systems for four intersections along Marshall Avenue in Williston with respect to condition and compliance with current state and federal design standards.  Recommended high-priority, medium-priority and low-priority improvements were identified including probable upgrade cost estimates depending on the existing conditions and functionality of the current signals system.
Consultant:
Stantec
Geography:
Williston

Essex Junction Parking Study

3.4 MB
Year:
2019
Theme:
Parking
Description:
An examination of current and future parking needs in the Village.
Consultant:
Stantec
Geography:
Essex Junction

Colchester Avenue/Riverside Avenue Scoping Report

35.4 MB
Year:
2019
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This is a scoping report for the intersections of Colchester Avenue, Riverside Avenue, Barrett Street, and Mill Street located in Burlington. It was conducted and coordinated with a separate scoping study of the adjacent Winooski River Bridge.
Consultant:
Hartgen Archaeological Associates, MTJ Roundabout Engineering, Stantec
Geography:
Burlington

VT Route 15 Sidewalk / Path Study, Athens to VT Route 289

7.1 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The Chittenden County Regional Planning Commission (CCRPC), working with the Town of Essex, the Village of Essex Junction, and Stantec Consulting Services, Inc. developed a scoping study evaluating sidewalk/path improvements for VT Route 15 between Athens Drive and VT Route 289. The goal of the scoping project was to identify options for an important missing link between the Town and Village pedestrian and bicycle network.
Consultant:
Stantec
Geography:
Essex, Essex Junction