Search Studies and Reports:

Reset All

Colchester Avenue/Riverside Avenue Scoping Report

35.4 MB
Year:
2019
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This is a scoping report for the intersections of Colchester Avenue, Riverside Avenue, Barrett Street, and Mill Street located in Burlington. It was conducted and coordinated with a separate scoping study of the adjacent Winooski River Bridge.
Consultant:
Hartgen Archaeological Associates, MTJ Roundabout Engineering, Stantec
Geography:
Burlington

VT Route 15 Sidewalk / Path Study, Athens to VT Route 289

7.1 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The Chittenden County Regional Planning Commission (CCRPC), working with the Town of Essex, the Village of Essex Junction, and Stantec Consulting Services, Inc. developed a scoping study evaluating sidewalk/path improvements for VT Route 15 between Athens Drive and VT Route 289. The goal of the scoping project was to identify options for an important missing link between the Town and Village pedestrian and bicycle network.
Consultant:
Stantec
Geography:
Essex, Essex Junction

VT Route 15 Bicycle/Pedestrian Improvements Study, Susie Wilson Road to West Street Extension

5.6 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The Chittenden County Regional Planning Commission (CCRPC), working with the Village of Essex Junction, the Town of Essex, and Stantec Consulting Services Inc. updated a scoping study completed in 2013 for bicycle and pedestrian improvements to VT Route 15 from Exit 15 to West Street Extension. This update looks more closely at the section between Susie Wilson Road and West Street Extension.
Consultant:
Stantec
Geography:
Essex, Essex Junction

Chamberlin Lane and Brennan Woods Drive Traffic Calming Study

2.8 MB
Year:
2018
Theme:
Traffic Calming
Description:
This study investigated existing traffic conditions and addressed residents' concerns regarding vehicular speeds along Chamberlin Lane and Brennan Woods Dr., and recommended necessary traffic calming measures.
Consultant:
Stantec
Geography:
Williston

I-89 Exit 14 Alternative Transportation Crossing Study Appendices

6.5 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The I-89 Exit 14 Alternative Transportation Crossing Study was undertaken to identify a means and alignment to improve pedestrian and bicycle access in the Exit 14 area.
Consultant:
Stantec
Geography:
South Burlington

I-89 Exit 14 Alternative Transportation Crossing Study

5.7 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The I-89 Exit 14 Alternative Transportation Crossing Study was undertaken to identify a means and alignment to improve pedestrian and bicycle access in the Exit 14 area.
Consultant:
Stantec
Geography:
South Burlington

Blair Park Traffic Calming Study

3 MB
Year:
2018
Theme:
Traffic Calming
Description:
This study investigated existing traffic conditions and addressed residents' concerns regarding vehicular speeds at the Blair Park; and determined the necessity of traffic calming measures on the Blair Park loop.
Consultant:
Stantec
Geography:
Williston

Exit 14 Signal Systems Assessment Study – Lane use Assessment

4.4 MB
Year:
2018
Theme:
ITS, Traffic
Description:
This study is a supplemental to the Exit 14 Signal Systems assessment study to investigate traffic operations at the Williston Road and Dorset Street, Dorset and Kennedy Drive intersections.  This study analyzed traffic operations with an alternative lane use by converting one of the two existing westbound left turn lanes on US 2/Williston Rd. into a third through lane and limit use of the far-right westbound lane to traffic destined to the Holiday Inn or the I-89 northbound ramp, and converting the exclusive northbound right turn lane on Dorset Street into a shared through/right turn lane at the Kennedy Drive intersection.
Consultant:
Stantec
Geography:
South Burlington