Search Studies and Reports:

Reset All

South Burlington Pedestrian and Bicycle Feasibility Study – Phase 2

11 MB
Year:
2020
Theme:
Bicycle & Pedestrian, Transportation
Description:
The CCRPC and the City of South Burlington initiated this scoping study to analyze and evaluate the feasibility of additional sidewalk and shared use paths at four (4) proposed study site locations: Spear Street from UVM George D. Aiken Forestry Sciences Laboratory to the Shelburne town line; Hinesburg Road from Williston Road to Kennedy Drive; Allen Road from Baycrest Drive to Shelburne Road, Harbor View Road from Shelburne; Road to Baycrest Drive, and Baycrest Drive from Harbor View Road to Allen Road; Fayette Drive from Queen City Park Road to Shelburne Road. This report analyzes and evaluates existing conditions, provides conceptual alternatives, and tabulates opinions of probable construction costs. It continues upon the previous efforts in the February 2017 report of the same name to improve and/or close the gaps of the South Burlington pedestrian and bicycle networks.
Consultant:
Toole Design Group
Geography:
South Burlington

South Burlington Bike Lane Feasibility at Williston Road/Hinesburg Road and Kennedy Drive

3.9 MB
Year:
2020
Theme:
Bicycle & Pedestrian, Traffic, Transportation
Description:
This memorandum summarizes the feasibility of continuing bicycle lanes through the intersections of Williston Road at Kennedy Drive/Airport Drive and Williston Road at Hinesburg Road/Patchen Road by reallocating roadway space used by vehicles.
Consultant:
Toole Design Group
Geography:
South Burlington

Chittenden County Shared Mobility Regional Analysis

8.5 MB
Year:
2019
Theme:
Bicycle & Pedestrian, bikesharing, shared mobility, Transportation
Description:
Greenride Bikeshare launched in April 2018 and provided a new public transportation option in Burlington, South Burlington and Winooski. CCRPC contracted with Toole Design to analyze the potential future expansion of the Greenride system and provide guidance on the placement of additional micromobility hubs and options such as e-assist bicycles and e-scooters that may support the growth and success of the region’s first shared mobility system.
Consultant:
Toole Design Group
Geography:
Burlington, Chittenden County, South Burlington, Winooski

Essex ADA Assessment

5.7 MB
Year:
2019
Theme:
ADA, Crossings, Sidewalk
Description:
The Town of Essex and the Village of Essex Junction, Vermont, with assistance from the Chittenden County Regional Planning Commission (CCRPC) and Toole Design, assessed priority sidewalks, pathways, and intersection crossings located at identified study focus areas, within the public right-of-way, for ADA compliance.
Consultant:
Toole Design Group
Geography:
Essex

Concepts for Crossings on Williston Road and Kennedy Drive

4.5 MB
Year:
2019
Theme:
Bicycle & Pedestrian, Traffic, Transportation
Description:
The Chittenden County Regional Planning Commission (CCRPC) and the City of South Burlington (the City) initiated this study to analyze and evaluate the feasibility of mid-block crossings in multiple locations in South Burlington, Vermont.
Consultant:
Toole Design Group
Geography:
South Burlington

Williston, VT Multimodal Scoping Study on Maple Road

1.8 MB
Year:
2018
Theme:
Bike and Ped, Sidewalk, Traffic Calming
Description:
The Chittenden County Regional Planning Commission (CCRPC) and the Town of Williston initiated this scoping study to analyze and evaluate alternatives to address residents’ concerns about speeding, cut-through traffic, and desire to improve multimodal safety on Maple Road.
Consultant:
Toole Design Group
Geography:
Williston

Assessment of Critical Non-Compliant Sidewalks, Paths, and Crossings

5.7 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Bike and Ped, Recreation, Safety, Sidewalk, Technical Assistance
Description:
In the Vermont communities of Essex and Essex Junction sidewalks, driveways, and intersection crossing infrastructure may be deficient, with ADA ramps, deteriorating sidewalk or pathways creating travel impairments, and signalized intersections that may not meet these requirements. State and federal laws and regulations require local governments to ensure that people with disabilities have full access to civic life within their communities. The purpose of the Assessment of Critical Non-Compliant Sidewalks, Paths, and Crossings is to assess, analyze, and develop a prioritization list of improvements to sidewalks, driveways, and intersections at identified study focus areas within the Town of Essex and Village of Essex Junction, Vermont.
Consultant:
Toole Design Group
Geography:
Essex, Essex Junction

ATP Appendices

5.8 MB
Year:
2017
Theme:
Bike/Ped
Description:
Appendices A through J
Consultant:
Toole Design Group
Geography:
Chittenden County

South Burlington, VT Pedestrian and Bicycle Feasibility Study

38.8 MB
Year:
2017
Theme:
Bike and Ped
Description:
The Chittenden County Regional Planning Commission (CCRPC) and the City of South Burlington (City) initiated this scoping study to analyze and evaluate the feasibility of additional sidewalk and shared use paths at four (4) proposed study site locations. This report analyzes and evaluates existing conditions, provides conceptual alignment alternatives, and details opinion of probable construction costs. Preferred concept alternative alignments as identified with the Project Steering Committee (PSC), through the public participation and outreach during the scoping study process, are highlighted within this scoping study.
Consultant:
Toole Design Group
Geography:
South Burlington