Year:
2016
Theme:
Bicycle & Pedestrian
Description:
Funded by a 2014 VTrans Bicycle/Pedestrian grant award, this scoping study analyzed and evaluated the feasibility of connecting a gap in the sidewalk on Railroad Street extending across the existing railroad crossing. This report analyzes and evaluates existing conditions, provides conceptual alignment alternatives, and provides opinion of probable construction costs.
Consultant:
Toole Design Group
Geography:
Milton