Search Studies and Reports:

Reset All

Patchen Road Scoping Study Appendices

195 MB
Year:
2026
Theme:
Bicycle & Pedestrian
Description:
The Patchen Road Scoping Study examined the Patchen Road corridor from Williston Road to the City of South Burlington / City of Burlington city line. The Study sought to identify alternatives to improve safety, accessibility, and connectivity for users of all ages and abilities.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
South Burlington

Patchen Road Scoping Study

11.6 MB
Year:
2026
Theme:
Bicycle & Pedestrian
Description:
The Patchen Road Scoping Study examined the Patchen Road corridor from Williston Road to the City of South Burlington / City of Burlington city line. The Study sought to identify alternatives to improve safety, accessibility, and connectivity for users of all ages and abilities.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
South Burlington

Northern Waterfront Connections Study; Appendices

151.8 MB
Year:
2025
Theme:
Bicycle & Pedestrian
Description:
The Northern Waterfront Connections Study was conducted to identify and evaluate conceptual alternatives for a new pedestrian connection between the downtown core and the northern waterfront. The study team included the Chittenden County Regional Planning Commission (CCRPC), the City of Burlington Community & Economic Development Office (CEDO), Burlington Office of Planning, and the Burlington Department of Public Works (DPW).
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

Northern Waterfront Connections Study; Feasibility Report

38.2 MB
Year:
2025
Theme:
Bicycle & Pedestrian
Description:
The Northern Waterfront Connections Study was conducted to identify and evaluate conceptual alternatives for a new pedestrian connection between the downtown core and the northern waterfront. The study team included the Chittenden County Regional Planning Commission (CCRPC), the City of Burlington Community & Economic Development Office (CEDO), Burlington Office of Planning, and the Burlington Department of Public Works (DPW).
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

City Center Transportation Analysis

2.7 MB
Year:
2023
Theme:
Land Use, Modeling, Traffic, Transportation
Description:
As the City of South Burlington contemplates the phasing of anticipated development and long planned connections through the newly established City Center area, understanding the potential traffic redistribution and transportation infrastructure improvements that may be required is key to planning transportation in the area. An evaluation of the transportation implications of new development and new connector roadways within City Center was conducted to identify transportation infrastructure and investments necessary to support growth in City Center.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
South Burlington

VT116/Kimball Avenue/Tilley Drive Area Land Use & Transportation Plan

3.1 MB
Year:
2021
Theme:
Transportation
Description:
This Plan evaluates how proposed land development affects the transportation network in the project area to help inform future land use and transportation decisions.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
South Burlington

East Allen Street Gateway Enhancements Scoping Study

69.7 MB
Year:
2020
Theme:
Bicycle & Pedestrian, Corridor, Infrastructure, Intersection, Safety, Traffic
Description:
The East Allen Street Gateway Enhancements Scoping Study examines the East Allen Street (Vermont Route 15) corridor from the Winooski Circulator east through the I-89 interchange to Roland Court to identify a suite of transportation and streetscape recommendations that improve safety and enhance accommodations for all modes along this important gateway into Winooski.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Winooski

VT 116 and Charlotte Rd Intersection Improvements

5.8 MB
Year:
2019
Theme:
Intersection, Safety, Technical Assistance, Traffic
Description:
This report examines realigning the sidewalk on the east side of VT-116 across the Lantman's exit with the intent of changing the signal phasing of the side streets from split to concurrent as a means to reduce congestion through Hinesburg Village.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Hinesburg

Skunk Hollow Road and VT 117 Intersection Scoping Study

6 MB
Year:
2018
Theme:
Intersection, Safety
Description:
The purpose of this study was to identify a preferred design alternative which addresses safety and mobility concerns at the Skunk Hollow Road and VT 117 intersection.  This study arrived at a preferred alternative through the traditional scoping process and selected a municipally-preferred design.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Jericho