Search Studies and Reports:

Reset All

Intervale Road Bicycle and Pedestrian Access Feasibility Study – Appendix

55.8 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Safety
Description:
The Chittenden County Regional Planning Commission (CCRPC), the City of Burlington, and project stakeholders collaborated on a study to identify a preferred approach for improving accessibility and safety for pedestrians and cyclists along Intervale Road in Burlington, Vermont. This is the Appendix for the Final Report.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

Intervale Road Bicycle and Pedestrian Access Feasibility Study

2.3 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Safety
Description:
The Chittenden County Regional Planning Commission (CCRPC), the City of Burlington, and project stakeholders collaborated on a study to identify a preferred approach for improving accessibility and safety for pedestrians and cyclists along Intervale Road in Burlington, Vermont.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

Malletts Bay Transportation and Stormwater Scoping Report – Appendix

16.9 MB
Year:
2017
Theme:
Bike/Ped, Intersection, Stormwater, Transportation
Description:
This scoping study identifies and evaluates alternatives that address stormwater management, bicycle and pedestrian accommodations along West Lakeshore Drive, and improvements at the Blakely Road and Lakeshore Drive intersection
Consultant:
Aldrich & Elliot, Stone Environmental, Third Sector Associates, Vanasse Hangen & Brustlin Inc.
Geography:
Colchester

Malletts Bay Stormwater Management System & Transportation Scoping Study

9.8 MB
Year:
2017
Theme:
Bike, Bike/Ped, Intersection, Pedestrian, Stormwater, Transportation
Description:
This scoping study identifies and evaluates alternatives that address stormwater management, bicycle and pedestrian accommodations along West Lakeshore Drive, and improvements at the Blakely Road and Lakeshore Drive intersection.
Consultant:
Aldrich & Elliot, Stone Environmental, Third Sector Associates, Vanasse Hangen & Brustlin Inc.
Geography:
Colchester

Winooski Transportation Master Plan

31.2 MB
Year:
2017
Theme:
Transportation
Description:
Through extensive outreach to a broad set of stakeholders, this Transportation Master Plan identifies the community’s values and vision for Winooski’s future transportation system. This plan includes a prioritized Action Plan to help the City ensure that future transportation policies and projects align with the community’s priorities and are directed toward a shared vision for the future of Winooski.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Winooski

Williston Road Network Transportation Study: Phase I – Initial Technical Evaluation

3 MB
Year:
2015
Theme:
Bicycle & Pedestrian, Corridor, Traffic, Transportation
Description:
The Williston Road Network Transportation Study evaluates the section of Williston Road between Dorset Street and Hinesburg Road. The Phase I effort includes a summary of existing and future conditions along the corridor as well as an initial screening of potential alternatives. Phase I includes the development of a subarea traffic model which, along with the Chittenden County Regional TransCAD transportation model, evaluates different future transportation strategies including increased use of transit, biking walking and carpooling.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
South Burlington

Harbor Road Technical Evaluation

6 MB
Year:
2011
Theme:
Bicycle & Pedestrian, Infrastructure, Schools, Traffic, Transportation
Description:
The purpose of this project is to provide a technical evaluation of Harbor Road in Shelburne, VT from its intersection with US Route 7 (Shelburne Road) west to its intersection with School Street. This evaluation will provide improvement recommendations based on data and information that VHB collected or obtained from applicable agencies.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Shelburne

Essex Town Bike Path Fee Analysis

99 kB
Year:
2011
Theme:
Bicycle & Pedestrian, Economic/Finance, Transportation
Description:
This short report contains the general base information needed by the Town to develop a bike path fee for new development. This will then be used to calculate a path impact fee that can be adopted by the Selectboard/Planning Commission.
Consultant:
Michael J. Munson PhD FAICP, Vanasse Hangen & Brustlin Inc.
Geography:
Essex

Susie Wilson Road Corridor Improvement Plan and Financing Option

5 MB
Year:
2010
Theme:
Infrastructure, Lighting, Transportation
Description:
The studies provided very useful information on which to base future policy and fees and greatly helped to provide the basis for installation of the LED lighting under the ARRA Energy Grant.
Consultant:
Dunn Associates Landscape Architects, Michael J. Munson PhD FAICP, Vanasse Hangen & Brustlin Inc.
Geography:
Essex

Silver Street Final Scoping Report, Hinesburg Vermont

18.6 MB
Year:
2007
Theme:
Corridor, Transportation
Description:
This study identified transportation and safety issues on Silver Street in Hinesburg and developed and evaluated possible solutions.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Hinesburg