Search Studies and Reports:

Reset All

South Burlington Kennedy Drive Bicyclist & Pedestrian Lighting Study

1.2 MB
Year:
2023
Theme:
Bike and Ped, Bike/Ped, Lighting
Description:
South Burlington, through the CCRPC's UPWP, sought the support of WSP to provide technical services for exploring lighting improvements to better serve the needs of bicyclists and pedestrians using the separated, 1.5-mile, shared-use path that runs parallel to the west bound lanes of Kennedy Drive between Dorset Street and Williston Road.
Consultant:
WSP
Geography:
South Burlington

I-89 Bolton and Milton Interchanges Assessment

5.4 MB
Year:
2022
Theme:
Interchange, Interstate
Description:
Born out of the I-89 2050 Study, this assessment reviewed two interchange concepts, one in Milton near the West Milton Road bridge over I-89, and one in Bolton near the Bolton Valley Access Road. Both locations have previously underwent some form of study. However, the previous studies date back to the late 1980s/early 1990s. This assessment served to review modern geometric design standards and environmental requirements as they pertain to each conceptual interchange.
Consultant:
WSP
Geography:
Bolton, Chittenden County, Milton

Shelburne Street Signal Timing Optimization and Coordination

3.6 MB
Year:
2018
Theme:
Traffic Operations, Traffic Signal
Description:
This technical study evaluated traffic signal operations at five intersections along the Shelburne Street corridor in Burlington and provided recommendations for signal operations improvements. The study area included the intersections of I-189 westbound off ramp, Shopping Center plazas, Home Avenue and Farrell Street, Flynn Avenue and Prospect Parkway with Shelburne Street.
Consultant:
WSP
Geography:
Burlington