Year:
2017
Theme:
ITS, Traffic Signal
Description:
This study is a part of the Exit 14 Area Signal Systems assessment study which focused on the traffic signal infrastructure assessment. This study focused on evaluating the existing signal timing plans and developed recommended updated signal timing plans for intersections along Dorset Street in South Burlington. The study corridor includes Dorset Street between Williston Road/US 2 and Kennedy Drive. The recommended signal timing plans were developed considering commuter peak period traffic volume data.
Consultant:
Stantec
Geography:
South Burlington