Search Studies and Reports:

Reset All

Winooski Avenue Transportation Study – Report

75.8 MB
Year:
2020
Theme:
complete streets, Corridor, multimodal, scoping, Transportation
Description:
The Winooski Avenue Transportation Study supports the City of Burlington’s efforts to create multimodal Complete Streets throughout the City. The two-mile corridor from Riverside Avenue at the north end to Howard Street/Saint Paul Street to the south runs through the center of Burlington and provides mobility to and from the City and access to homes, shopping, and employment. This study identifies ways to address safety challenges, maintain a high level of multimodal mobility, and support community and economic development aspirations as set forth by the planBTV comprehensive plan for the City of Burlington.
Consultant:
Resource Systems Group Inc.
Geography:
Burlington

Lake Street Pedestrian Streetscape and Stormwater Feasibility Study

10 MB
Year:
2020
Theme:
Bike/Ped, Bike/Pedestrian, Stormwater
Description:
Lake Street in Burlington is a shared use street that connects the City core to the northern waterfront. There are two mid-block pedestrian crossings on this segment. The road is landscaped with street trees and granite blocks. Stormwater runoff sheet flows across the road from east to west. Runoff from nearby properties drains over Lake Street at the driveway intersections. Most of the stormwater sheet flows into small swales or ponds in the nearest low spot. The City with funding from the CCRPC studied possible pedestrian, streetscape and stormwater improvements for Lake Street in the project area.
Consultant:
Stantec
Geography:
Burlington

Chittenden County Shared Mobility Regional Analysis

8.5 MB
Year:
2019
Theme:
Bicycle & Pedestrian, bikesharing, shared mobility, Transportation
Description:
Greenride Bikeshare launched in April 2018 and provided a new public transportation option in Burlington, South Burlington and Winooski. CCRPC contracted with Toole Design to analyze the potential future expansion of the Greenride system and provide guidance on the placement of additional micromobility hubs and options such as e-assist bicycles and e-scooters that may support the growth and success of the region’s first shared mobility system.
Consultant:
Toole Design Group
Geography:
Burlington, Chittenden County, South Burlington, Winooski

Winooski River Bridge Scoping Study

63 MB
Year:
2019
Theme:
Bridges
Description:
CCRPC, in partnership with Cities of Winooski and Burlington, and the Vermont Agency of Transportation, completed this study for the US RTs 2/7 bridge over the Winooski River.  The purpose of the project is to improve safety for all users while maintaining structural integrity and continuity of this vital link between the two cities.  Several issues and needs motivated the parties to look at this bridge, including: 1) Addressing the condition of this aging bridge structure as it is in the latter stage of its service life, 2) providing designated safe lanes for bicyclists, 3) continuing the necessary two lanes of traffic in both directions, and 4) improving safety conditions for pedestrians.
Consultant:
McFarland-Johnson
Geography:
Burlington, Winooski

Colchester Avenue/Riverside Avenue Scoping Report

35.4 MB
Year:
2019
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This is a scoping report for the intersections of Colchester Avenue, Riverside Avenue, Barrett Street, and Mill Street located in Burlington. It was conducted and coordinated with a separate scoping study of the adjacent Winooski River Bridge.
Consultant:
Hartgen Archaeological Associates, MTJ Roundabout Engineering, Stantec
Geography:
Burlington

Intervale Road Bicycle and Pedestrian Access Feasibility Study – Appendix

55.8 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Safety
Description:
The Chittenden County Regional Planning Commission (CCRPC), the City of Burlington, and project stakeholders collaborated on a study to identify a preferred approach for improving accessibility and safety for pedestrians and cyclists along Intervale Road in Burlington, Vermont. This is the Appendix for the Final Report.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

Intervale Road Bicycle and Pedestrian Access Feasibility Study

2.3 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Safety
Description:
The Chittenden County Regional Planning Commission (CCRPC), the City of Burlington, and project stakeholders collaborated on a study to identify a preferred approach for improving accessibility and safety for pedestrians and cyclists along Intervale Road in Burlington, Vermont.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

Shelburne Street Signal Timing Optimization and Coordination

3.6 MB
Year:
2018
Theme:
Traffic Operations, Traffic Signal
Description:
This technical study evaluated traffic signal operations at five intersections along the Shelburne Street corridor in Burlington and provided recommendations for signal operations improvements. The study area included the intersections of I-189 westbound off ramp, Shopping Center plazas, Home Avenue and Farrell Street, Flynn Avenue and Prospect Parkway with Shelburne Street.
Consultant:
WSP
Geography:
Burlington

CarShare Vermont Urban Boomer Outreach Campaign Final Report

56.8 kB
Year:
2018
Theme:
Transportation Demand Management
Description:
Historically, carsharing programs across the country have primarily served a younger demographic (people aged 18-45). However, recent research has indicated that Baby Boomers are increasingly relocating to urban areas that offer increased mobility options. As they enjoy a more active, multimodal lifestyle, many are choosing to reduce their vehicle ownership. We wanted to understand if this trend is consistent in Chittenden County, and whether this growing demographic is ripe for carsharing. Our goals for this project were to conduct market research, conduct outreach in collaboration with partners, and increase membership among the population aged 51-69.
Consultant:
(none)
Geography:
Burlington, Winooski

CarShare Vermont Business Activation Campaign Final Report

50 kB
Year:
2018
Theme:
Transportation Demand Management
Description:
This report summarizes the efforts of CarShare Vermont to activate employee members of existing business accounts by encouraging them to utilize CarShare Vermont's service and supporting employers in better integrating CarShare Vermont into their personnel policies and transportation practices. As part of the project, CarShare Vermont set out to develop a suite of outreach materials targeting employees that could be distributed among business members to help them promote carsharing across their organizations. Additionally, CarShare Vermont wanted to understand from business members what information and guidance they needed to best utilize the service and maximize its benefits, such as VMT reduction, cost savings, and employee wellbeing. Finally, CarShare Vermont wanted to develop a resource to help businesses evaluate the impact of offering CarShare Vermont to their employees.
Consultant:
(none)
Geography:
Burlington, Winooski