Search Studies and Reports:

Reset All

Pearl Street (VT-15) Pedestrian Crossing Scoping Study

12.2 MB
Year:
2026
Theme:
Bicycle & Pedestrian, Bike and Ped, Bike/Ped, Transit-Oriented Development
Description:
CCRPC worked with the City of Essex Junction and consultant Hoyle Tanner to evaluate one to two locations for crosswalks along Pearl Street through the City. The potential crosswalk(s) would be located on Pearl Street (State Route 15) between Warner Avenue and Weston Way, a half mile stretch that does not currently have a crosswalk and is designated as a Class 1 Town Highway. The study includes conceptual plans and cost estimates for two alternatives at each of the chosen locations.​
Consultant:
Hoyle - Tanner & Associates
Geography:
Essex Junction

Pearl Street Multimodal Improvements Scoping Study

4.4 MB
Year:
2025
Theme:
Bicycle & Pedestrian
Description:
Pearl Street (Vermont Route 15 ), between Susie Wilson Road and West Street Extension in the City of Essex Junction, is a high-volume car-oriented corridor with no dedicated accommodation for bicycles and no eastbound public transit facilities. Recent improvements have been made to bicycle and pedestrian facilities at both ends of this corridor. Improvements to this 2300-foot-long segment of VT 15 will link these facilities and create a continuous multi-modal transportation corridor from Lime Kiln Road in Colchester to downtown Essex Junction. This is a supplemental scoping study to update the 2018 VT Route 15 Bicycle/Pedestrian Scoping Study.
Consultant:
Stantec
Geography:
Essex Junction

Essex Junction Parking Study

3.4 MB
Year:
2019
Theme:
Parking
Description:
An examination of current and future parking needs in the Village.
Consultant:
Stantec
Geography:
Essex Junction

Densmore Drive Culverts Scoping Study

1.3 MB
Year:
2019
Theme:
Stormwater, Transportation, Water Quality
Description:
The CCRPC selected Watershed Consulting Associates (WCA) for initial scoping, assessment, alternatives analysis, and 30% design development for the replacement of two (2) culverts on Densmore Drive in Essex Junction, VT.
Consultant:
Watershed Consulting Associates
Geography:
Essex Junction

Design 5 Corners Implementation Plan

There is no download available for this item. Please contact us to request a hard copy.

Year:
2019
Theme:
Bicycle & Pedestrian, Livability, Safety, Sidewalk
Description:
A study designed to make Essex Junction Village more vibrant and walkable by reducing the 5 Corners to 4 following construction of the Crescent Connector road.
Consultant:
DuBois & King Inc.
Geography:
Essex Junction

VT Route 15 Sidewalk / Path Study, Athens to VT Route 289

7.1 MB
Year:
2018
Theme:
Bicycle & Pedestrian
Description:
The Chittenden County Regional Planning Commission (CCRPC), working with the Town of Essex, the Village of Essex Junction, and Stantec Consulting Services, Inc. developed a scoping study evaluating sidewalk/path improvements for VT Route 15 between Athens Drive and VT Route 289. The goal of the scoping project was to identify options for an important missing link between the Town and Village pedestrian and bicycle network.
Consultant:
Stantec
Geography:
Essex, Essex Junction