Search Studies and Reports:

Reset All

VT 15 Corridor Study

35.8 MB
Year:
2008
Theme:
Corridor, Transportation
Description:
The Route 15 Corridor is the stretch of land 8 miles long and several miles wide between Essex Junction and Burlington that runs along Route 15 in Chittenden County. In this historic area are Fanny Allen Hospital, now part of the Fletcher Allen Health Care System, St. Michaels College, and the picturesque Fort Ethan Allen (now a vibrant mixed-use area with housing and commercial development), The Champlain Valley Fairgrounds, Camp Johnson, Vermonts richest farmlands in the Intervale, and the protected land of the Winooski Valley Park District. At either end, the corridor connects two major economic centers, the IBM Essex Junction facility and the City of Burlington. The following corridorwide and local reports delve into the many aspects of the corridor future, from rail implementation, TOD, Market, and Alternatives analysis, Modelling, et al.
Consultant:
Buckhurst Fish & Jacquemart Inc., Resource Systems Group Inc., TranSystems / E.H. Pechan & Associates
Geography:
Colchester, Essex, Essex Junction, Jericho, Underhill, Winooski

Route 15 Bicycle and Pedestrian Facility Feasibility Study: Colchester to Essex Junction

62.6 MB
Year:
2007
Theme:
Bicycle & Pedestrian, Corridor, Transportation
Description:
In 1996, the Chittenden County Metropolitan Planning Organization began work on a scoping study for an alternate Transportation Path in the Route 15 corridor between Essex Junction and Colchester. To assist in the work, the CCMPO hired Lamoureux & Dickinson Consulting Engineers (L&D) of Essex, Vermont. L&D held several public work sessions, circulated an informal survey to bicyclists and residents, met with the municipal boards, conducted field survey and did extensive work to prepare the Scoping Study. After L&D prepared a draft report, numerous outside factors lead to the CCMPO halting work on the project. This Study is an update of the previous work prepared by L&D as part of the original Study.
Consultant:
Wilbur Smith Associates
Geography:
Colchester, Essex, Essex Junction

VT Route 15 & Educational Drive

18.5 MB
Year:
2006
Theme:
Transportation
Description:
The purpose of this scoping report is to develop and evaluate potential alternative improvements at the VT Route 15 / Educational Drive intersection. Since the Educational Drive / Central Street / Drury Drive intersection is within the influence of VT Route 15, it is also included in this evaluation.
Consultant:
(none)
Geography:
Essex Junction

Final Report on the Susie Wilson/Route 15 Jughandle

1.9 MB
Year:
2005
Theme:
Intersection, Technical Assistance, Transportation
Description:
This report evaluates the operations and safety concerns related to the westbound Route 15 jughandle lane at the Susie Wilson Road/Route 15 intersection in Essex Junction. Alternatives are proposed and evaluated that will allow for safe direction reversal for eastbound Route 15 traffic. The Village of Essex Junction initiated the study through a request to the CCMPO Technical Assistance program.
Consultant:
Smart Mobility Inc.
Geography:
Essex, Essex Junction

Essex Junction Fleming and Summit Street Schools ~ Technical Assistance Report (DRAFT)

601.2 kB
Year:
2004
Theme:
Intersection, Safety, Schools, Technical Assistance, Transportation
Description:
This report responds to traffic congestion and safety issues at Fleming and Summit Street schools when students arrive and depart from the school. CCMPO staff attended several meetings of an ad-hoc safety committee at Fleming School and arranged to have outside experts audit the pedestrian routes near the schools as part of a Walkable Communities workshop in June 2003.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Essex Junction

VT Route 15: Modeling of Existing Conditions and Optimized Signal Operations

10.3 MB
Year:
2004
Theme:
Corridor, Signal, Transportation
Description:
The purpose of the study is to determine the corridor’s performance with a coordinated signal system. In addition, this study identifies opportunities and constraints for improving intersection and corridor performance. To evaluate performance a model was developed and calibrated through field observations.
Consultant:
Dufresne Henry Consulting Engineers Inc.
Geography:
Colchester, Essex, Essex Junction, Jericho, Underhill

Transit-Oriented Development Opportunities for the Route 15 Corridor

18.2 MB
Year:
2003
Theme:
Corridor, Transit-Oriented Development, Transportation
Description:
Transit-Oriented Development (TOD) provides a more compact development pattern located within an easy walk of a fixed transit stop (bus or rail), with a mix of residential, employment and shopping opportunities. It focuses on pedestrian-oriented design and provides viable transportation alternatives for residents and workers via walking, bicycling, and transit.
Consultant:
Basile Baumann Prost and Associates Inc., DMJM+Harris
Geography:
Colchester, Essex, Essex Junction, Winooski

TOD Planning: Market Analysis, Development Opportunities & Fiscal/Economic Impact

11.1 MB
Year:
2003
Theme:
Corridor, Transit-Oriented Development, Transportation
Description:
CCMPO engaged DMJM+HARRIS and Basile, Bauman, Prost and Associates, Inc. (BBP Associates) to work with the communities of Winooski, Colchester, Essex and Essex Junction to help develop TOD concept plans for the areas surrounding the proposed passenger rail stations.
Consultant:
Basile Baumann Prost and Associates Inc., DMJM+Harris
Geography:
Colchester, Essex, Essex Junction, Winooski

Financial and Institutional Strategy Route 15 Corridor Improvement Plan: Burlington-Essex Rail Project

423.9 kB
Year:
2002
Theme:
Corridor, Economic/Finance, Rail, Transportation, Western Corridor
Description:
The purpose of this report is to present the institutional and financial strategy for implementing the Rt. 15 Corridor Improvement Plan, including the Burlington to Essex Rail Project, and to address the larger transit funding and institutional issues that are raised by the plan.
Consultant:
AECOM Consulting Transportation Group, DMJM+Harris
Geography:
Burlington, Essex, Essex Junction, Winooski

Route 15 Corridor Improvement Plan Burlington to Essex Rail Project: Travel Demand Modeling Methodology and Results

1.6 MB
Year:
2002
Theme:
Corridor, Modeling, Transportation
Description:
The purpose of the study is to determine the corridor’s performance with a coordinated signal system. In addition, this study identifies opportunities and constraints for improving intersection and corridor performance. To evaluate performance a model was developed and calibrated through field observations.
Consultant:
DMJM+Harris, Resource Systems Group Inc., Smart Mobility Inc.
Geography:
Burlington, Essex, Essex Junction, Winooski