Huntington Bridges and Culverts Maintenance Plan

41.1 MB
Year:
2021
Theme:
Bridges and Culverts, Capital Improvement Plan
Description:
The Town of Huntington with assistance from the Chittenden County Regional Planning Commission (CCRPC) evaluated the current condition of Town bridges and culverts, and developed an infrastructure improvement plan.  The purpose of this plan is to develop a planning tool for the Town to maintain an overall satisfactory/or better transportation network by repairing, replacing or preserving infrastructure on a programmed schedule, and increase condition ratings of structures and to inform the annual municipal budget for bridges and culverts maintenance.
Consultant:
McFarland-Johnson
Geography:
Huntington

Camels Hump Road Speed Study

253.9 kB
Year:
2017
Theme:
speed study, Transportation
Description:
The Town of Huntington requested a traffic speed study for Camels Hump Road from Main Road to the parking area at the end of road. In order for a Legislative Body to determine a safe and reasonable speed on town highways, a traffic engineering investigation (speed study) is required by Vermont Statutes Annotated Title 23, § 1007. This document provides supporting findings that were used to develop recommendations for setting a speed limit for Camels Hump Road.
Consultant:
(none)
Geography:
Huntington

Huntington Main Road Pavement Evaluation Study

6.7 MB
Year:
2012
Theme:
Infrastructure, Pavement, Technical Assistance, Transportation
Description:
The Town of Huntington owns and maintains Main Road, running from the Richmond Town Line to the Buel’s Gore Line. This study documents a roadway condition evaluation of Main Rd to assess the costs for the town maintainance in the short (5 year) and long term (20 year) time frames. The document summarizes the inventory, geotechnical borings, maintenance history, estimated repair and maintenance costs, and proposed maintenance strategies.
Consultant:
DuBois & King Inc.
Geography:
Huntington

Main Road Bridge Improvements ~ Huntington ~ Scoping Report for Bridge No. 10 Over Huntington River

13.5 MB
Year:
2010
Theme:
Bridges, Infrastructure, Transportation
Description:
This project deals with the study of alternatives for correcting existing deficiencies on Bridge No. 10 over Huntington River in Huntington, Vermont. The bridge carries a town-maintained highway and is owned by the town. The purpose of the project is to improve safety and mobility for vehicular traffic, bicycles, and pedestrians along Main Road in the town of Huntington at the location of this bridge crossing.
Consultant:
Inc., McFarland-Johnson
Geography:
Huntington

Main Road Bridge Improvements ~ Huntington ~ Scoping Report for Bridge No. 8 Over Huntington River

16.1 MB
Year:
2010
Theme:
Bridges, Infrastructure, Transportation
Description:
This project deals with the study of alternatives for correcting existing deficiencies on the Main Road Bridge (South of the Moody Road intersection) over Huntington River in Huntington, Vermont. The bridge carries a town-maintained highway and is owned by the town. The purpose of the project is to improve safety and mobility for vehicular traffic, bicycles, and pedestrians along Main Road in the town of Huntington at the location of this bridge crossing.
Consultant:
Inc., McFarland-Johnson
Geography:
Huntington

Main Road Speed Limit Study ~ Huntington, Vermont

6 MB
Year:
2009
Theme:
Safety, Speed, Traffic, Transportation
Description:
This study was undertaken at the request of the Town of Huntington in order to evaluate existing and potential speed transition zones buffering the town’s three villages along Main Road. The appendices contain 3 distinct Speed Limit Engineering Studies for different locations along Main Road.
Consultant:
(none)
Geography:
Huntington

Town of Huntington Pavement Management Study

1.3 MB
Year:
2008
Theme:
Infrastructure, Pavement, Technical Assistance, Transportation
Description:
Pavement condition study for the Town of Huntington covering the year 2008.
Consultant:
CCMPO
Geography:
Huntington

Huntington Traffic Calming Plan

1.7 MB
Year:
2008
Theme:
Safety, Speed, Traffic, Transportation
Description:
The Town of Huntington is concerned about the high speeds of traffic through the village centers of Lower Village and Huntington Center, and has approached the Chittenden County Metropolitan Organization (CCMPO) for technical assistance on this issue. This report describes a plan of traffic calming strategies that can be implemented over time to achieve the desired reductions in travel speeds. “Traffic Calming” is a set of traffic engineering strategies that through a variety of mechanisms result in lower traffic speeds. A brief introduction to traffic calming is attached to this report.
Consultant:
Dunn Associates Landscape Architects, ORW Landscape Architects and Planners, Smart Mobility Inc.
Geography:
Huntington

Huntington Traffic Calming Plan – Attachment 1

338.1 kB
Year:
2008
Theme:
Safety, Speed, Traffic, Transportation
Description:
The Town of Huntington is concerned about the high speeds of traffic through the village centers of Lower Village and Huntington Center, and has approached the Chittenden County Metropolitan Organization (CCMPO) for technical assistance on this issue. This report describes a plan of traffic calming strategies that can be implemented over time to achieve the desired reductions in travel speeds. “Traffic Calming” is a set of traffic engineering strategies that through a variety of mechanisms result in lower traffic speeds. A brief introduction to traffic calming is attached to this report.
Consultant:
ORW Landscape Architects and Planners, Smart Mobility Inc.
Geography:
Huntington

Huntington Traffic Calming Plan – Attachment 2

2 MB
Year:
2008
Theme:
Safety, Speed, Traffic, Transportation
Description:
The Town of Huntington is concerned about the high speeds of traffic through the village centers of Lower Village and Huntington Center, and has approached the Chittenden County Metropolitan Organization (CCMPO) for technical assistance on this issue. This report describes a plan of traffic calming strategies that can be implemented over time to achieve the desired reductions in travel speeds. “Traffic Calming” is a set of traffic engineering strategies that through a variety of mechanisms result in lower traffic speeds. A brief introduction to traffic calming is attached to this report.
Consultant:
ORW Landscape Architects and Planners, Smart Mobility Inc.
Geography:
Huntington