Search Studies and Reports:

Reset All

Richmond Village Parking Study: Final Report Appendix 4

198.1 kB
Year:
2007
Theme:
Bicycle & Pedestrian, Transportation
Description:
The City of Burlington has a lively downtown with the picturesque University of Vermont at the top of the hill. A variety of pedestrian connections with sidewalks and alleyways exist between the University and the central business district. However, the central business district and its neighborhoods to the north are physically separated from the waterfront by a steep escarpment north of College Street. The purpose of this study is to begin to re-integrate the city with its waterfront through pedestrian connections.
Consultant:
Dunn Associates Landscape Architects
Geography:
Burlington, Jericho

VT Route 15 – Jericho to Hardwick Corridor Management Plan

10.8 MB
Year:
2004
Theme:
Corridor, Transportation
Description:
Covering the corridor for VT 15 from the Essex/Jericho Town line in Chittenden County, through Lamoille County, and on to Hardwick located in Caledonia County, this plan presents a list of transportation system recommendations and identifies land use planning and regulatory tools that will help preserve the corridor’s function as a minor arterial while protecting and eventually enhancing the quality of life throughout the study area.
Consultant:
Resource Systems Group Inc.
Geography:
Essex, Jericho, Underhill

VT Route 15 – Jericho to Hardwick Corridor Management Plan ~ Summary

780.7 kB
Year:
2004
Theme:
Corridor, Transportation
Description:
Covering the corridor for VT 15 from the Essex/Jericho Town line in Chittenden County, through Lamoille County, and on to Hardwick located in Caledonia County, this plan presents a list of transportation system recommendations and identifies land use planning and regulatory tools that will help preserve the corridor’s function as a minor arterial while protecting and eventually enhancing the quality of life throughout the study area.
Consultant:
Resource Systems Group Inc.
Geography:
Essex, Jericho, Underhill

The Jericho Transportation Study

11.9 MB
Year:
2004
Theme:
Corridor, Transportation
Description:
The Jericho Transportation Study investigates and assesses the existing transportation system, evaluates future conditions, and presents a list of recommendations. The study will be used by the Jericho Planning Commission as it updates the Municipal Plan, the Development Review Board to assist with project review, and the Selectboard as it updates the Capital Plan and considers impact fees. The transportation network has been analyzed for intersection performance, capacity analysis, safety, and suitability for pedestrians and bicyclists.
Consultant:
Resource Systems Group Inc.
Geography:
Jericho

Town of Jericho Roadway Surface Management Study

214.8 kB
Year:
2004
Theme:
Infrastructure, Pavement, Technical Assistance, Transportation
Description:
Pavement condition study for the Town of Jericho covering the year 2004.
Consultant:
CCMPO
Geography:
Jericho

VT Route 15: Modeling of Existing Conditions and Optimized Signal Operations

10.3 MB
Year:
2004
Theme:
Corridor, Signal, Transportation
Description:
The purpose of the study is to determine the corridor’s performance with a coordinated signal system. In addition, this study identifies opportunities and constraints for improving intersection and corridor performance. To evaluate performance a model was developed and calibrated through field observations.
Consultant:
Dufresne Henry Consulting Engineers Inc.
Geography:
Colchester, Essex, Essex Junction, Jericho, Underhill

VT Route 15/River Road

22.5 MB
Year:
2001
Theme:
Transportation
Description:
(none)
Consultant:
Dufresne Henry Consulting Engineers Inc.
Geography:
Jericho

Jericho Center Speed Study

1.3 MB
Year:
1999
Theme:
Safety, Speed, Technical Assistance, Transportation
Description:
Jericho Center residents are concerned that vehicular speeds through Jericho Center are too great. The Town has installed road signage and orange, pedestrian drums at cross walks in an effort to reduce speeds. At the request of the Town, CCMPO conducted speed counts on Browns Trace Road as it approaches and passes through the village of Jericho Center. This report presents the results of those speed counts.
Consultant:
(none)
Geography:
Jericho