Search Studies and Reports:

Reset All

Potash Brook Path Crossing Feasibility Study

18.1 MB
Year:
2022
Theme:
Bicycle & Pedestrian
Description:
This study evaluates bicycle and pedestrian options for crossing Potash Brook adjacent to Kimball Avenue in South Burlington, Vermont.
Consultant:
DuBois & King Inc.
Geography:
South Burlington

Swift and Spear Street Intersection Feasibility Study

10.3 MB
Year:
2021
Theme:
Bicycle & Pedestrian, Intersection, Safety
Description:
This project explored feasible options to improve walking, bicycling, and driving through the Swift and Spear Street intersection in  South Burlington.  This study considered four feasible alternatives, including a roundabout, to improve safety and function of the Swift and Spear St. intersection.
Consultant:
DuBois and King Inc.
Geography:
South Burlington

I-89 Exit 14 Alternative Transportation Crossing Supplemental Study

10.6 MB
Year:
2021
Theme:
Bicycle & Pedestrian
Description:
This study builds upon a previous study completed in May 2018, "I-89 Exit 14 Alternative Transportation Crossing Study", and provides a more detailed evaluation of the preferred alternative which is a new bike/pedestrian structure across I-89 near Exit 14.
Consultant:
Stantec
Geography:
South Burlington

VT116/Kimball Avenue/Tilley Drive Area Land Use & Transportation Plan

3.1 MB
Year:
2021
Theme:
Transportation
Description:
This Plan evaluates how proposed land development affects the transportation network in the project area to help inform future land use and transportation decisions.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
South Burlington

City Center Parking & Movement Plan

6.8 MB
Year:
2020
Theme:
Parking
Description:
This study outlines a phased parking strategy and mobility recommendations for the City Center area of the City of South Burlington, Vermont. The study area focuses on development and redevelopment along Market Street, Garden Street, and adjacent areas served by Williston Road and Dorset Street.
Consultant:
Stantec
Geography:
South Burlington

South Burlington Bike Lane Feasibility at Williston Road/Hinesburg Road and Kennedy Drive

3.9 MB
Year:
2020
Theme:
Bicycle & Pedestrian, Traffic, Transportation
Description:
This memorandum summarizes the feasibility of continuing bicycle lanes through the intersections of Williston Road at Kennedy Drive/Airport Drive and Williston Road at Hinesburg Road/Patchen Road by reallocating roadway space used by vehicles.
Consultant:
Toole Design Group
Geography:
South Burlington

South Burlington 2019 EV Fleet Guidance

347.1 kB
Year:
2019
Theme:
Energy
Description:
A summary of fleet efficiency options and brief analysis of potential costs and benefits of switching out to more efficient vehicles, including plug-in electric vehicle (EV) options, is included below.
Consultant:
VEIC
Geography:
South Burlington

Chittenden County Shared Mobility Regional Analysis

8.5 MB
Year:
2019
Theme:
Bicycle & Pedestrian, bikesharing, shared mobility, Transportation
Description:
Greenride Bikeshare launched in April 2018 and provided a new public transportation option in Burlington, South Burlington and Winooski. CCRPC contracted with Toole Design to analyze the potential future expansion of the Greenride system and provide guidance on the placement of additional micromobility hubs and options such as e-assist bicycles and e-scooters that may support the growth and success of the region’s first shared mobility system.
Consultant:
Toole Design Group
Geography:
Burlington, Chittenden County, South Burlington, Winooski