Interstate 89 Exit 14W Southbound Ramp Congestion Study ~ Initial Scoping Report

1.2 MB
Year:
1993
Theme:
Intersection, Interstate, Safety, Transportation
Description:
The impetus for initiating this project is due to an unsafe condition which has developed during the morning peak hour traffic period between approximately 7:30 a.m. and 8:30 a.m. at this I-89 Interchange ramp west bound towards Burlington (Ramp C). This study is to determine the causes of, and possible solutions to the long queue that develops, creating a back-up in the travel lanes on I-89.
Consultant:
Pinkham Engineering Associates Inc.
Geography:
Burlington, South Burlington

Interchange Feasibility Studies at Four Locations in the Chittenden County MPO Area

8.9 MB
Year:
1987
Theme:
Corridor, Interstate, Transportation
Description:
The purpose of this study is to conduct economic benefit-cost analyses of interchange improvements at four locations on Interstate 89 in Chittenden County , Vermont.
Consultant:
Storch Engineers
Geography:
Milton, South Burlington, Winooski

Burlington International Airport Study (including 1993 update)

3.4 MB
Year:
1985
Theme:
Aviation, Transportation
Description:
This study covers Airport Governance Alternatives for the Burlington International Airport (BIA), including investigation of selected airports nationwide having various types of governance and the relationship to airport services including conclusions and recommendations.
Consultant:
(none)
Geography:
Burlington, South Burlington

Interstate Route Studies through the Greater Burlington Area

59.2 MB
Year:
1976
Theme:
Corridor, Infrastructure, Interstate, Traffic, Transportation
Description:
This report is concerned with the specific alignment of a small portion of the entire Interstate network in Vermont and will of necessity discuss the local as well as the national aspects. The recommended plan will furnish access to the Interstate network for traffic generated in the Area and provide quick and safe routes for interstate traffic which has this Area as its destination. In addition, this plan will relieve local traffic and provide a by-pass route for traffic to pass through to other regions. This is in accordance with the statement contained in the Federal Highway Act of 1956; That local needs to the extent practicable, suitable and feasible be given equal consideration with the needs of interstate commerce...
Consultant:
Boswell Engineering Company Consultants
Geography:
Burlington, Chittenden County, Colchester, Essex, Essex Junction, South Burlington, State, Winooski

Dorset Street & Williston Road Intersection Access Analysis

573 kB
Year:
1976
Theme:
Infrastructure, Intersection, Technical Assistance, Traffic, Transportation
Description:
Site plan review for the South Burlington Planning Commission for a proposed 172 unit motel-restaurant-lounge complex on the Lamplough property at the intersection of Dorset St. and Williston Rd.
Consultant:
(none)
Geography:
South Burlington