Year:
1993
Theme:
Intersection, Interstate, Safety, Transportation
Description:
The impetus for initiating this project is due to an unsafe condition which has developed during the morning peak hour traffic period between approximately 7:30 a.m. and 8:30 a.m. at this I-89 Interchange ramp west bound towards Burlington (Ramp C). This study is to determine the causes of, and possible solutions to the long queue that develops, creating a back-up in the travel lanes on I-89.
Consultant:
Pinkham Engineering Associates Inc.
Geography:
Burlington, South Burlington