Main Road Bridge Improvements ~ Huntington ~ Scoping Report for Bridge No. 8 Over Huntington River

16.1 MB
Year:
2010
Theme:
Bridges, Infrastructure, Transportation
Description:
This project deals with the study of alternatives for correcting existing deficiencies on the Main Road Bridge (South of the Moody Road intersection) over Huntington River in Huntington, Vermont. The bridge carries a town-maintained highway and is owned by the town. The purpose of the project is to improve safety and mobility for vehicular traffic, bicycles, and pedestrians along Main Road in the town of Huntington at the location of this bridge crossing.
Consultant:
Inc., McFarland-Johnson
Geography:
Huntington