Search Studies and Reports:

Reset All

61 results found.
Showing page 2 of 7

Bayside Build-Out Traffic Analysis

1.9 MB
Year:
2015
Theme:
Buildout, Intersection, New Capacity, Traffic, Transportation
Description:
The Town of Colchester requested CCRPC staff expertise in evaluating congestion and examining alternatives for improvement at the Bayside Park signalized intersection. Alternatives focused on congestion reduction while also attempting to increase land-use connectivity between Bayside Park and Bayside Beach
Consultant:
(none)
Geography:
Colchester

Bayside Build-Out Land Use Analysis

445.6 kB
Year:
2015
Theme:
Buildout, Intersection, Land Use, New Capacity, Traffic, Transportation
Description:
CCRPC staff worked with Town staff to evaluate multiple transportation alternatives in order to improve capacity at the Bayside Park intersection. Alternatives 3B and 4B were the alternatives recommended for land use analysis. The purpose of the land use analysis was to determine the amount of development (in terms of new dwelling units and commercial floor area) that could occur given the increased capacity and additional trips that could be accommodated through the Bayside Park intersection as a result of the transportation improvements. This memo also estimates tax revenue associated with the additional development for Alternative 3B.
Consultant:
(none)
Geography:
Colchester

Interstate 89 – Exit 17 Scoping Study

15.7 MB
Year:
2014
Theme:
Intersection, Interstate, New Capacity, Regional Planning, Safety, Signal, Traffic, Transportation
Description:
The Exit 17 Scoping Study was initiated in the spring of 2013 through its inclusion in the Chittenden County Regional Planning Commission’s (CCRPC) Unified Planning Work Program (UPWP). The focus of this scoping study was to develop and evaluate build alternatives for relieving congestion, increasing safety, and improving bicycle conditions at the I-89 Exit 17 interchange and adjacent intersection of US 2 and US 7—locally known as Chimney Corners—near the Colchester/Milton town line in Chittenden County, Vermont.
Consultant:
Parsons Brinckerhoff
Geography:
Chittenden County, Colchester, Federal, Milton, State

Colchester-Essex Network Transportation Study – CENTS

38.9 MB
Year:
2014
Theme:
Bicycle & Pedestrian, Corridor, Intersection, Traffic
Description:
The Colchester-Essex Network Transportation Study was undertaken to evaluate the impact of partial Circ construction (segments C-F from VT117 to VT2A) on east-west travel along VT2A and Severance Road/Kellogg Road in Colchester and Essex and the impact of not constructing the remaining Circ segment. The study  evaluated the VT2A, Severance/Kellogg Road and Susie Wilson Road corridors.
Consultant:
Resource Systems Group Inc.
Geography:
Colchester, Essex

West Lakeshore Drive / Prim Road – Intersection Scoping Study

3.9 MB
Year:
2013
Theme:
Intersection, Safety, Traffic, Transportation
Description:
This scoping study evaluated alternatives concerning the intersection of West Lakeshore Drive and Prim Road.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

West Lakeshore Drive / Prim Road – Intersection Scoping Study – Appendices

4.4 MB
Year:
2013
Theme:
Intersection, Safety, Traffic, Transportation
Description:
This scoping study evaluated alternatives concerning the intersection of West Lakeshore Drive and Prim Road.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Blakely Road / Laker Lane Scoping Study – Appendices

4.5 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Blakely Road / Laker Lane Scoping Study

3.4 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Laker Lane Scoping Study – Appendices

4.5 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Laker Lane Scoping Study

3.4 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester