Search Studies and Reports:

Reset All

23 results found.
Showing page 2 of 3

Road Safety Audit Review ~ Silver Street

852.8 kB
Year:
2008
Theme:
Safety, Transportation
Description:
The location of this RSAR was on Silver Street between Timber Pond Road and Heron Pond Road.
Consultant:
(none)
Geography:
Hinesburg

Road Safety Audit Review ~ Pond Road

981.7 kB
Year:
2008
Theme:
Safety, Transportation
Description:
The location of this RSAR was on Pond Road between Place Road and Kozas Run.
Consultant:
(none)
Geography:
Hinesburg

Road Safety Audit Review ~ Shelburne Falls Road

2.2 MB
Year:
2007
Theme:
Safety, Transportation
Description:
The location of this RSAR was on Shelburne Falls Road in both directions between Route 116 to the Shelburne town line (2.9 miles), and between Richmond Road from the intersection of North Road (1.9 Miles).
Consultant:
(none)
Geography:
Hinesburg

Silver Street Final Scoping Report, Hinesburg Vermont

18.6 MB
Year:
2007
Theme:
Corridor, Transportation
Description:
This study identified transportation and safety issues on Silver Street in Hinesburg and developed and evaluated possible solutions.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Hinesburg

Hinesburg VT116 Sidewalk Feasibility Study

1.1 MB
Year:
2006
Theme:
Bicycle & Pedestrian, Schools, Sidewalk, Transportation
Description:
The purpose of this study is to evaluate the feasibility of constructing three new sidewalk segments in Hinesburg Village and to provide the Town with the documentation necessary to pursue preliminary engineering and construction funding through applicable Federal and VTrans sources.
Consultant:
Resource Systems Group Inc.
Geography:
Hinesburg

Hinesburg VT116 Sidewalk Feasibility Study – Plans

1.3 MB
Year:
2006
Theme:
Bicycle & Pedestrian, Schools, Sidewalk, Transportation
Description:
The purpose of this study is to evaluate the feasibility of constructing three new sidewalk segments in Hinesburg Village and to provide the Town with the documentation necessary to pursue preliminary engineering and construction funding through applicable Federal and VTrans sources.
Consultant:
Resource Systems Group Inc.
Geography:
Hinesburg

Hinesburg Park and Ride

4 MB
Year:
2006
Theme:
Park and Ride, Parking, Transportation
Description:
The 2005 Chittenden County Metropolitan Transportation Plan (MTP) adopted January 19, 2005, included strategies and projects for the VT Route 116 corridor. A new Park and Ride facility in Hinesburg Village was mentioned as a recommended project.
Consultant:
Dufresne Henry Consulting Engineers Inc.
Geography:
Hinesburg

Hinesburg Center Road Feasibility Study

8.2 MB
Year:
2005
Theme:
Bicycle & Pedestrian, Safety, Technical Assistance, Transportation
Description:
To improve the transportation network in the village, the Town of Hinesburg requested assistance from the Chittenden County MPO (CCMPO) in examining the feasibility of a connector road in the center of the village area of Hinesburg. The connector would provide convenient bicycle and pedestrian accommodations and facilitate internal traffic movements in the village center.
Consultant:
Dufresne Henry Consulting Engineers Inc.
Geography:
Hinesburg

Route 116 Hinesburg Village Corridor

18 MB
Year:
2004
Theme:
Transportation
Description:
The purpose of this study was to: identify and evaluate physical and functional deficiencies along a 1.5 mile Route 116 roadway corridor between Shelburne Falls Road on the north and Buck Hill Road on the south; document potential solutions and constraints; and develop base plans for further project development.
Consultant:
DuBois & King Inc.
Geography:
Hinesburg

Feasibility Study West Side Road

561.2 kB
Year:
2004
Theme:
Technical Assistance, Transportation
Description:
The goal was to determine the feasibility of a new north/south alternative alignment west of Route 116, from Silver Street, just south of the Route 116 intersection, to Shelburne Falls Road.
Consultant:
Dufresne Henry Consulting Engineers Inc.
Geography:
Hinesburg