Search Studies and Reports:

Reset All

57 results found.
Showing page 3 of 6

Blair Park Pedestrian Facility Scoping Study

19.1 MB
Year:
2015
Theme:
Bicycle & Pedestrian, Sidewalk
Description:
The purpose of this study is to determine a "preferred alternative" for new pedestrian facilities in Blair Park mixed-use subdivsion in Williston.
Consultant:
Stantec
Geography:
Williston

VT 117/North Williston Road Scoping Study

18.1 MB
Year:
2015
Theme:
Intersection, Resiliency, Storm Water, Traffic
Description:
This study was one of several conducted as part of the CIRC Alternatives process.  It examined traffic alternatives at the intersection and flood resiliency improvements to North Williston Road.
Consultant:
DuBois & King Inc.
Geography:
Essex, Williston

Mountain View Road Bicycle/Pedestrian Facilities

13.9 MB
Year:
2014
Theme:
Bicycle & Pedestrian, Recreation
Description:
This Scoping Study evaluates potential bicycle and pedestrian improvements along Mountain View Road from VT Route 2A to North Williston Road.
Consultant:
Stantec
Geography:
Williston

Williston-Essex Network Transportation Study (WENTS)

9.2 MB
Year:
2014
Theme:
Corridor, Mobility, Transportation Network Analysis
Description:
The major goal of the Williston-Essex Network Transportation Study (WENTS) is to develop a set of multimodal strategies, policies, and land use strategies that enhance corridor mobility, improve access to major employment and retail centers, minimize congestion, improve safety, support economic development, and enhance environmental quality within the Williston and Essex area.
Consultant:
RSG Inc.
Geography:
Essex, Regional, Williston

Exit 12/VT 2A Final Scoping Report

13.4 MB
Year:
2014
Theme:
Corridor, Traffic, Transportation
Description:
This Exit 12 & VT 2A Scoping Study carries forward the WENTS reccomendations to further investigate and refine transportation alternatives that address existing and projected traffic congestion; enhance safety for all users; improve bike-pedestrian connections from areas South of the interchange to the existing network North of the interchange; and advance economic growth in the area.
Consultant:
Resource Systems Group Inc.
Geography:
Williston

US 2 Multimodal Transportation Scoping Study

45.8 MB
Year:
2014
Theme:
Bicycle & Pedestrian
Description:
Bike/Ped improvements along US RT 2 from Taft Corners to North Williston Road.
Consultant:
DuBois & King Inc.
Geography:
Williston

VT Route 2A & Harvest Lane Bicycle/Pedestrian Facilities

12.1 MB
Year:
2014
Theme:
Bicycle & Pedestrian
Description:
This Scoping Study evaluates possible bicycle and pedestrian improvements in three areas around Taft Corners and along VT Route 2A in Williston:  along the western and eastern sides of VT2A between Wright Avenue and US2;  along VT2A between Knight Lane and O’Brien Court; and a missing sidewalk segment along the eastern side of Harvest Lane.
Consultant:
Stantec
Geography:
Williston

VT 2A Scoping Study – Industrial Avenue / Mountain View Road to River Cove Road

2 MB
Year:
2014
Theme:
Bicycle & Pedestrian, Corridor, Traffic
Description:
This Scoping Study evaluated alternative strategies to address existing and expected future travel demands at the VT2A/Industrial Avenue/Mountain View Road intersection and along VT2A north to River Cove Road.
Consultant:
Stantec
Geography:
Williston