Search Studies and Reports:

Sort by:

Reset All

U.S. Route 7 ~ Town of Milton: Traffic Engineering-Transportation Planning Assistance Project

1.2 MB
Year:
1989
Theme:
Modeling, Safety, Technical Assistance, Traffic, Transportation
Description:
This memorandum summarizes the findings and recommendations for the examination of locations along U.S. Route 7 in the Town of Milton. This document reflects comments received from the Town and the client, the Chittenden County Regional Planning Commission (CCRPC), at a preliminary briefing, and is accompanied by four scaled aerial photograph plan sheets depicting the recommendations. The memorandum is organized by the four locations examined along U.S. Route 7 intersections with: 1. Lake Road, 2. Main Street, 3. Middle Road/Railroad Street Extension, and 4. West Milton Road/Racine Road. Each of the locations is discussed below beginning with a description of existing conditions and observed problems.
Consultant:
JHK & Associates
Geography:
Milton

Essex Junction Village Center Area Parking Study

1.7 MB
Year:
1989
Theme:
Parking, Transportation
Description:
Objectives of this study was to; 1. Assess the nature of the "Parking Problem" in the Village Center area and determine the demand for parking, 2. To inventory the actual supply of parking in the area, 3. To develop recommendations for overcoming any parking deficits and remedy other facets of the "Parking Problem".
Consultant:
Research and Evaluation Specialists of Vermont Inc
Geography:
Essex Junction

Development of the Chittenden County Regional Travel Demand Model

2.3 MB
Year:
1989
Theme:
Modeling, Transportation
Description:
This report describes the structure and development of the Chittenden County Regional Travel Demand Model. The objective of the model development effort was to produce a planning tool which could be used to consistently evaluate the regional transportation effects of a range of roadway improvement and development projects. The effort consisted of the design and administration of a resident survey questionnaire, collection of land use data for the entire Chittenden County region, compilation of data describing the regional roadway network, estimation of mathematical equations to describe travel behavior of residents, and implementation of the model into a commercial transportation planning computer package; TMODLE2.
Consultant:
Resource Systems Group Inc.
Geography:
Chittenden County

Chittenden County Regional Bicycle Plan

1.8 MB
Year:
1988
Theme:
Bicycle & Pedestrian, Infrastructure, Transportation
Description:
The conclusions and recommendations reached in this plan draw on an inventory of existing and proposed bicycle facilties focussing on the nine MPO communities (Burlington, Colchester, Essex, Essex Junction, Milton, Shelburne, South Burlington, Williston and Winooski). Data on facilities were collected by contact with town planners, recreation directors and street department superintendents in combination with field surveys of existing facilities throughout the county.
Consultant:
(none)
Geography:
Chittenden County

Chittenden County Bus Stop Location & Design Study

2.3 MB
Year:
1988
Theme:
Bicycle & Pedestrian, Bus, Infrastructure, Transit, Transportation
Description:
This report presents general guidelines and recommendations for efficient location and design of bus stops. A literature search and field survey of CCTA bus stops was used to develop this summary of recommended practices and procedures.
Consultant:
(none)
Geography:
Chittenden County

Williston/Taft Corners Transportation Study

3.1 MB
Year:
1987
Theme:
Modeling, Traffic, Transportation
Description:
Analysis of traffic impacts of growth in the Taft Corners area of the Town of Williston. This study analyzes existing and future conditions, and presents detailed recommendations for upgrading the area transportation system through a combination of public and private resources.
Consultant:
(none)
Geography:
Williston

1987 CCMPO Transportation Plan

6.1 MB
Year:
1987
Theme:
Transportation
Description:
Provides goals and policies for the use of transportation resources, particularly highways and public transportation. This plan serves as a flexible tool to ensure the development and mantenance of balanced and efficient transportation systems that complement regional land use and economic development.
Consultant:
(none)
Geography:
Chittenden County

Interchange Feasibility Studies at Four Locations in the Chittenden County MPO Area

8.9 MB
Year:
1987
Theme:
Corridor, Interstate, Transportation
Description:
The purpose of this study is to conduct economic benefit-cost analyses of interchange improvements at four locations on Interstate 89 in Chittenden County , Vermont.
Consultant:
Storch Engineers
Geography:
Milton, South Burlington, Winooski

Burlington International Airport Study (including 1993 update)

3.4 MB
Year:
1985
Theme:
Aviation, Transportation
Description:
This study covers Airport Governance Alternatives for the Burlington International Airport (BIA), including investigation of selected airports nationwide having various types of governance and the relationship to airport services including conclusions and recommendations.
Consultant:
(none)
Geography:
Burlington, South Burlington