Search Studies and Reports:

Sort by:

Reset All

Transit, Bicycle, and Pedestrian Improvement Study for Williston and Shelburne Roads: South Burlington, Vermont

2 MB
Year:
1993
Theme:
Bicycle & Pedestrian, Transit, Transportation
Description:
The goal of this study will be to find ways to balance the use of the corridor and improve it for bus, bicycle and pedestrian traffic. This design is an attempt to accommodate the needs of several transportation users and to create a truly inviting and comfortable shared transportation corridor. It maximizes the use of alternative transportation choices, relieves the current pressure on automobile use, and improves the traveling experience for all those using the corridor.
Consultant:
Kathleen Ryan
Geography:
South Burlington

Interstate 89 Exit 14W Southbound Ramp Congestion Study ~ Initial Scoping Report

1.2 MB
Year:
1993
Theme:
Intersection, Interstate, Safety, Transportation
Description:
The impetus for initiating this project is due to an unsafe condition which has developed during the morning peak hour traffic period between approximately 7:30 a.m. and 8:30 a.m. at this I-89 Interchange ramp west bound towards Burlington (Ramp C). This study is to determine the causes of, and possible solutions to the long queue that develops, creating a back-up in the travel lanes on I-89.
Consultant:
Pinkham Engineering Associates Inc.
Geography:
Burlington, South Burlington

Williston Alternative Transportation Path Master Plan

2.1 MB
Year:
1993
Theme:
Infrastructure, Municipal Planning, Transportation
Description:
The purpose of this plan is to provide a network of paths, sidewalks, and bicycle routes that will provide a safe and efficient alternative to the current automobile dependent transportation system within Williston, VT. This system is developed to encourage non-motorized modes and multi-modal links of transportation. The emphasis of this plan is to provide utilitarian connections between the neighborhoods and communities within the city and to city activity centers.
Consultant:
FitzPatrick-Lleweeln Inc., Resource Systems Group Inc., T.J. Boyle & Associates
Geography:
Williston

Colchester Alternative Transportation Path Master Plan – Country Meadows Study

750.3 kB
Year:
1993
Theme:
Infrastructure, Municipal Planning, Transportation
Description:
This document is an addition to the Colchester Alternative Plan specific to the Country Meadows Subdivision across Indian Brook to Colchester Village and Main Street.
Consultant:
FitzPatrick-Lleweeln Inc.
Geography:
Colchester

Colchester Alternative Transportation Path Master Plan – Colchester “Cut” Charrette

1.3 MB
Year:
1993
Theme:
Infrastructure, Municipal Planning, Transportation
Description:
This document is an addition to the Colchester Alternative Plan which investigates the possibility of reconditioning the causeway and crossing the "cut" with a 10' wide bicycle and pedestrian path.
Consultant:
FitzPatrick-Lleweeln Inc.
Geography:
Colchester

Burlington Comprehensive Pedestrian Route Study

4.5 MB
Year:
1993
Theme:
Bicycle & Pedestrian, Infrastructure, Transportation
Description:
The existing pedestrian routes within the City of Burlington have been characterized by traditional sidewalks, several alleyways, and the bikepath along the lake. Presently, there are several areas of conflict that exist on these different routes throughout the city. This study involved identifying these areas of conflict with recommended improvements as well as suggesting additional innerblock connections from the immediate central-business district to the waterfront.
Consultant:
Dunn Associates Landscape Architects, Stan Clauson Associates Planners, Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

CCPRC Alternative Transportation Plan Maps

4.1 MB
Year:
1993
Theme:
Infrastructure, Municipal Planning, Transportation
Description:
Various maps and memos for the Alternative Transportation Path Plan.
Consultant:
FitzPatrick-Lleweeln Inc.
Geography:
Burlington, Colchester

Pre-Development Planning Study for a Transportation Center

3.2 MB
Year:
1993
Theme:
Infrastructure, Technical Assistance, Transportation
Description:
This study looks to analyze Burlington's waterfront as a potential area for a transportation center, determine necessary program elements and facilities for a multi-modal transportation center, and identifies potential sites.
Consultant:
Dunn Associates Landscape Architects, Stan Clauson Associates Planners, Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

Burlington Waterfront Infrastructure Study

3.5 MB
Year:
1993
Theme:
Infrastructure, Parking, Transportation
Description:
This study is prepared to provide technical supporting data for conceptual infrastructure improvements (i.e. water sewer, storm drainage, roadways, utlilities, parking) for the downtown Burlington Waterfront. This study supercedes the infrastructure study prepared in 1988. This study has evaluated the existing infrastructure and determined what improvements are necessary to meet the needs of the project. A phasing plan is proposed that will utilize the city planned infrastructure upgrades and a public/private partnership to help apportion costs for the proposed developments.
Consultant:
Dunn Associates Landscape Architects, Stan Clauson Associates Planners, Vanasse Hangen & Brustlin Inc.
Geography:
Burlington