Search Studies and Reports:

Reset All

Burlington International Airport Parking Alternatives Study

9.8 MB
Year:
1999
Theme:
Aviation, Parking, Transportation
Description:
In order to maintain a competitive position, BIA must continue to offer an adequate parking supply. At the same time, the airport must respond to environmental and traffic concerns and offer economic development opportunities where possible. The Chittenden County Metropolitan Planning Organization (CCMPO) was requested by the Airport and the City of Burlington to perform a study of airport parking issues and to develop a range of alternative concepts for future accessibility to the airport.
Consultant:
Wilbur Smith Associates
Geography:
Burlington

I-89 Exit 13 Access Improvements Scoping Report

26.1 MB
Year:
1999
Theme:
Interstate, Transportation
Description:
(none)
Consultant:
Dufresne Henry Consulting Engineers Inc.
Geography:
South Burlington

Operational Analysis, System Plan, and Funding Alternatives for the Chittenden County Transportation Authority

64.9 kB
Year:
1999
Theme:
Bus, Transit, Transportation
Description:
The CCTA Systems Plan and Operational Analysis is intended to redesign the transit system and the Transit Funding Alternatives Analysis explored the alternative funding mechanisms to generate the funds to support the new design. This report summarizes both the systems plan and funding alternatives. These projects explored a vision of what services CCTA would need to operate to optimize efficiency and effectiveness.
Consultant:
KFH Group
Geography:
Chittenden County

Fact Sheet on History of Chittenden County Circumferential Highway (CCCH) Planning Efforts

58.6 kB
Year:
1999
Theme:
Land Use, Regional Planning, Transportation
Description:
This fact sheet responds to a January 1999 request by the Chittenden County Metropolitan Planning Organization (CCMPO) Board of Directors for information on the history of Chittenden County Circumferential Highway (CCCH) planning efforts. The CCMPO Board requested this information to help it better understand the nature and context of planning work conducted to date in the CCCH project development process.
Consultant:
(none)
Geography:
Chittenden County

Truck Network Analysis: Vehicle Related Criteria

3.9 MB
Year:
1999
Theme:
Freight, Infrastructure, Safety, Transportation, Truck
Description:
The Vermont Agency of Transportation is providing this report to ensure that the best information available has been compiled and analyzed to provide a solid foundation for the discussion on commercial vehicle size. The Truck Network Analysis and the CVEST Final Report are intended to provide a framework for development of the Vermont commercial vehicle policy.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
State

Chittenden County Park and Ride Lots Prioritization: Interim Report

245.2 kB
Year:
1999
Theme:
Park and Ride, Parking, Transportation, Transportation Demand Management
Description:
A 1993 study by Hamlin Engineers identified twenty potential locations for new Park and Ride lots in Chittenden County, which also identified the need to update the County’s existing Park and Ride lots. Specific sites were identified within the Circumferential Highway corridor in Essex and Colchester as well as general locations throughout the County. The purpose of this interim report is to prioritize these twenty-two locations for use by the Vermont Agency of Transportation and as a first step in developing an action plan for Chittenden County.
Consultant:
(none)
Geography:
Chittenden County

New England Central Railroad Double Stack Clearance Study

10.9 MB
Year:
1999
Theme:
Freight, Rail, Transportation
Description:
Vermont Legislature mandated feasibility study to evaluate suitability of double stack traffic according to industry clearance standards.
Consultant:
Costello Lomasney & DeNapoli Inc., Gordon Bua & Read Inc.
Geography:
State

U.S. Route 7 and Rebecca Lane Drive Intersection Upgrade (updated in 2004 as Milton High School Access Improvements)

26.7 MB
Year:
1998
Theme:
Bicycle & Pedestrian, Intersection, Safety, Schools, Signal, Traffic
Description:
The purpose of the U.S.Route 7 and Rebecca Lander Drive Intersection Upgrade study was to identify existing deficiencies and concerns regarding High School access and recommend a solution that better serves the needs of the users. This study was put on hold pending development of additional information and was updated in 2004.
Consultant:
Webster-Martin Consulting Engineers
Geography:
Milton

ABRB Passenger Service Study

40.6 MB
Year:
1998
Theme:
Rail, Transportation, Western Corridor
Description:
Feasibility study for establishing passenger rail service along the Vermont Western Corridor
Consultant:
Clough Harbour & Associates LLP, LS Transit Systems Inc., Resource Systems Group Inc.
Geography:
State

Route 127 Corridor Study: Colchester, Vermont – Final Report

7.1 MB
Year:
1998
Theme:
Corridor, Infrastructure, Transportation
Description:
The purpose of this study was to identify and evaluate physical and functional deficiencies along the east-west Route 127 highway corridor through the town of Colchester, to document potential solutions and constraints, and to develop an implementation plan for further project development.
Consultant:
DuBois & King Inc.
Geography:
Colchester