Search Studies and Reports:

Sort by:

Reset All

ECOS Historic Development and Future Land Use/Transportation Analysis

6.4 MB
Year:
2017
Theme:
Land Use, Transportation
Description:
This report presents the historic and recent development patterns in Chittenden County, VT over the last sixty years and the potential impacts of various future land use/transportation scenarios.
Consultant:
(none)
Geography:
Chittenden County

Richmond Road Pedestrian and Bicycle Scoping Study

5.1 MB
Year:
2017
Theme:
Bike and Ped
Description:
An evaluation and preferred alternative selection on ways to improve walking and cycling along this 1.7 mile corridor in Hinesburg
Consultant:
Toole Design Group
Geography:
Hinesburg

Winooski Transportation Master Plan

31.2 MB
Year:
2017
Theme:
Transportation
Description:
Through extensive outreach to a broad set of stakeholders, this Transportation Master Plan identifies the community’s values and vision for Winooski’s future transportation system. This plan includes a prioritized Action Plan to help the City ensure that future transportation policies and projects align with the community’s priorities and are directed toward a shared vision for the future of Winooski.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Winooski

South Burlington Pedestrian and Bicycle Feasibility Study

38.8 MB
Year:
2017
Theme:
Bicycle & Pedestrian
Description:
The CCRPC and the City of South Burlington initiated this study to analyze and evaluate the feasibility of additional sidewalk and shared use paths at four (4) proposed study site locations: Allen Road (Baycrest Drive to Spear Street); Dorset Street (Autumn Hill Road to Dorset Street/Nowland Farm Road/Old Cross Road intersection); Airport Parkway (Kirby Road to Lime Kiln Bridge); and Spear Street (from shared use path south of Davis Road to US Route 2 Jug Handle/East Terrace). This report analyzes and evaluates existing conditions, provides conceptual alignment alternatives, and details opinion of probable construction costs. Preferred concept alternative alignments as identified with the Project Steering Committee (PSC), through the public participation and outreach during the
scoping study process, are highlighted within this scoping study.
Consultant:
Toole Design Group
Geography:
South Burlington

STOP Sign Study: Blair Park/Paul St., and Zephyr Road/Day Lane Intersections

838.5 kB
Year:
2016
Theme:
STOP sign, Traffic Control
Description:
This study evaluated the existing traffic conditions and stop controlled intersections of Blair Park and Paul Street, and Zephyr Road and Day Lane to determine appropriate STOP sign configuration with recent changes in land use and traffic conditions.
Consultant:
(none)
Geography:
Williston

MobilityShare Final Report – CarShare Vermont

181.8 kB
Year:
2016
Theme:
(none)
Description:
MobilityShare was launched in 2012 by CarShare Vermont with significant funding from a private foundation. The primary goal in developing this program was to improve the accessibility and equity of our local transportation system by making our carsharing service more available to low-income residents. In 2015 CarShare Vermont received a UPWP grant to review, modify, and relaunch MobilityShare program. This report outlines a brief history of the program and changes to streamline and revitalize it.
Consultant:
CarShare Vermont
Geography:
Chittenden County

Milton Railroad Street Rail Crossing Study

6.8 MB
Year:
2016
Theme:
Bicycle & Pedestrian
Description:
Funded by a 2014 VTrans Bicycle/Pedestrian grant award, this scoping study analyzed and evaluated the feasibility of connecting a gap in the sidewalk on Railroad Street extending across the existing railroad crossing. This report analyzes and evaluates existing conditions, provides conceptual alignment alternatives, and provides opinion of probable construction costs.
Consultant:
Toole Design Group
Geography:
Milton

Economic and Technical Analysis of Key Employee Commute TDM Strategies

751.4 kB
Year:
2016
Theme:
Transit, Transportation Demand Management
Description:
This project allowed the City of Burlington to study in more detail the economic costs, technological issues, and other details and logistics associated with the design and implementation of a Universal/Unlimited Access Transit Pass program, and a complementary Parking-Cash Out/ Commute Allowance Program for City employees, as two recommended strategies from the 2015 Transportation Demand Management (TDM) Action Plan.
Consultant:
(none)
Geography:
Burlington

Bolton Valley Access Road and Duxbury Road Speed Studies

290.5 kB
Year:
2016
Theme:
Speed, Technical Assistance
Description:
This document summarizes existing travel conditions analysis, findings and recommendations for setting speed limits on Bolton Valley Access Road and Duxbury Road.
Consultant:
(none)
Geography:
Bolton