Right of Way Condition Inventory for Stormwater Management, Phase I – Wards 5&6 City of Burlington, Vermont

1.3 MB
Year:
2021
Theme:
Environment, Storm Water, Stormwater
Description:
On behalf of Chittenden County Regional Planning Commission (CCRPC) and the City of Burlington (City), Stone Environmental, Inc. (Stone) has completed the Right of Way Condition Inventory for Stormwater Management within Burlington Wards 5 and 6. A summary of the inventory and tasks completed are described below. Data from the project is in two web maps Soil Boring Status Map and BTV Soil and Utility ROW Assessment Map. These two maps can be accessed by viewing the embedded links in the paragraph titled 1. Introduction.
Consultant:
Stone Environmental
Geography:
Burlington