Right of Way Condition Inventory for Stormwater Management, Phase II – Wards 2&3, City of Burlington, Vermont

2.1 MB
Year:
2022
Theme:
Environment, Infrastructure, Storm Water, Stormwater
Description:
On behalf of Chittenden County Regional Planning Commission (CCRPC) and the City of Burlington (City), Stone Environmental, Inc. (Stone) completed in June 2022 a Right of Way Condition Inventory for Stormwater Management within Burlington Wards 2 and 3. A summary of the inventory and tasks completed are described below. Data from the project is in two web maps Soil Boring Status Map and BTV Soil and Utility ROW Assessment Map. See section 1. Introduction to click on embedded web links to these maps.
Consultant:
Stone Environmental
Geography:
Burlington