Search Studies and Reports:

Reset All

Route 15 Corridor Improvement Plan Burlington to Essex Rail Project: Travel Demand Modeling Methodology and Results

1.6 MB
Year:
2002
Theme:
Corridor, Modeling, Transportation
Description:
The purpose of the study is to determine the corridor’s performance with a coordinated signal system. In addition, this study identifies opportunities and constraints for improving intersection and corridor performance. To evaluate performance a model was developed and calibrated through field observations.
Consultant:
DMJM+Harris, Resource Systems Group Inc., Smart Mobility Inc.
Geography:
Burlington, Essex, Essex Junction, Winooski