Search Studies and Reports:

Sort by:

Reset All

Malletts Bay Stormwater Management System & Transportation Scoping Study

9.8 MB
Year:
2017
Theme:
Bike, Bike/Ped, Intersection, Pedestrian, Stormwater, Transportation
Description:
This scoping study identifies and evaluates alternatives that address stormwater management, bicycle and pedestrian accommodations along West Lakeshore Drive, and improvements at the Blakely Road and Lakeshore Drive intersection.
Consultant:
Aldrich & Elliot, Stone Environmental, Third Sector Associates, Vanasse Hangen & Brustlin Inc.
Geography:
Colchester

South Burlington, VT Pedestrian and Bicycle Feasibility Study

2.6 MB
Year:
2017
Theme:
Bike and Ped
Description:
The Chittenden County Regional Planning Commission (CCRPC) and the City of South Burlington (City) initiated this scoping study to analyze and evaluate the feasibility of additional sidewalk and shared use paths at four (4) proposed study site locations. This report analyzes and evaluates existing conditions, provides conceptual alignment alternatives, and details opinion of probable construction costs. Preferred concept alternative alignments as identified with the Project Steering Committee (PSC), through the public participation and outreach during the scoping study process, are highlighted within this scoping study.
Consultant:
Toole Design Group
Geography:
South Burlington

Bay Road Bike and Pedestrian Mobility Study

18.1 MB
Year:
2017
Theme:
Bike and Ped
Description:
The Chittenden County Regional Planning Commission (CCRPC) and the Town of Shelburne initiated this scoping study to analyze and evaluate alternatives for providing walking and bicycling facilities along Bay Road. Bay Road is heavily used by people walking, biking, and driving, and provides access to Shelburne Bay, Shelburne Bay Park, Shelburne Farms, and the Ti Haul Recreation Path. This report summarizes the scoping study process, public participation results,and findings.
Consultant:
Toole Design Group
Geography:
Shelburne