Search Studies and Reports:

Reset All

East Charlotte Village Traffic Analysis Study – Appendices

7.5 MB
Year:
2023
Theme:
Safety, Speed, Traffic Calming
Description:
The purpose of this traffic study is to identify potential countermeasures intended to reduce vehicle speeds and increase safety by establishing a sense of place and creating a more comfortable environment for all modes of travel within the East Charlotte Village center. Appendices
Consultant:
VHB
Geography:
Charlotte

East Charlotte Village Traffic Analysis Study

1.9 MB
Year:
2023
Theme:
Safety, Speed, Traffic Calming
Description:
The purpose of this traffic study is to identify potential countermeasures intended to reduce vehicle speeds and increase safety by establishing a sense of place and creating a more comfortable environment for all modes of travel within the East Charlotte Village center. Alternatives were developed, evaluated, vetted through public forums and supported by the Town.  This study identified and provided an overview of the preferred alternatives inclusive of preliminary cost estimates, conceptual level designs and next steps for implementation.
Consultant:
VHB
Geography:
Charlotte

Swift and Spear Street Intersection Feasibility Study

10.3 MB
Year:
2021
Theme:
Bicycle & Pedestrian, Intersection, Safety
Description:
This project explored feasible options to improve walking, bicycling, and driving through the Swift and Spear Street intersection in  South Burlington.  This study considered four feasible alternatives, including a roundabout, to improve safety and function of the Swift and Spear St. intersection.
Consultant:
DuBois and King Inc.
Geography:
South Burlington

Underhill Roadway Safety Analysis: Pleasant Valley Road and Irish Settlement Road

13 MB
Year:
2021
Theme:
Bike, Bike/Ped, Bike/Pedestrian, Safety
Description:
The safety review presented in this report includes two roadways in Underhill, VT being considered as designated bicycle routes. These roadways are the entire length of Irish Settlement Road and a segment of Pleasant Valley Road. These two roads serve as potential bicycle route connections between Underhill Center and Vermont Route 15 in Cambridge, VT, a popular cycling route in the state.
Consultant:
VHB
Geography:
Underhill

Skunk Hollow Road and VT 117 Intersection Scoping Study

6 MB
Year:
2018
Theme:
Intersection, Safety
Description:
The purpose of this study was to identify a preferred design alternative which addresses safety and mobility concerns at the Skunk Hollow Road and VT 117 intersection.  This study arrived at a preferred alternative through the traditional scoping process and selected a municipally-preferred design.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Jericho

Intervale Road Bicycle and Pedestrian Access Feasibility Study – Appendix

55.8 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Safety
Description:
The Chittenden County Regional Planning Commission (CCRPC), the City of Burlington, and project stakeholders collaborated on a study to identify a preferred approach for improving accessibility and safety for pedestrians and cyclists along Intervale Road in Burlington, Vermont. This is the Appendix for the Final Report.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Burlington

East Charlotte Village and Spear St Speed Study

1.8 MB
Year:
2013
Theme:
Safety, speed study
Description:
This study evaluated existing road conditions and travel behavior of motorists along Spear Street and near the East Charlotte village area.  This study provided recommendations for a preferred speed limit and potential traffic measures within the study area.
Consultant:
(none)
Geography:
Charlotte