South Burlington Kennedy Drive Bicyclist & Pedestrian Lighting Study

1.2 MB
Year:
2023
Theme:
Bike and Ped, Bike/Ped, Lighting
Description:
South Burlington, through the CCRPC's UPWP, sought the support of WSP to provide technical services for exploring lighting improvements to better serve the needs of bicyclists and pedestrians using the separated, 1.5-mile, shared-use path that runs parallel to the west bound lanes of Kennedy Drive between Dorset Street and Williston Road.
Consultant:
WSP
Geography:
South Burlington

Vermont Route 116 Crosswalk Scoping Study

19.1 MB
Year:
2023
Theme:
Bicycle & Pedestrian, Bike and Ped, Bike/Ped, Sidewalk
Description:
This study investigates potential crosswalk improvements at three locations along the Vermont Route 116 corridor in Hinesburg. The purpose of the study was to review two existing crosswalks and evaluate a potential new crosswalk at a third location. The three crosswalk locations include: 1. Mid-block crosswalk near United Church of Hinesburg 2. Mid-block crosswalk near Hinesburg Community School 3. Buck Hill Road intersection.
Consultant:
Hoyle - Tanner & Associates
Geography:
Hinesburg

Walk & Bike Connectivity Study

7 MB
Year:
2022
Theme:
Bicycle & Pedestrian, Bike/Ped, Walk & Bike
Description:
The Walk & Bike Connectivity Study is an Action Plan for improving walking and bicycling conditions and therefore connectivity throughout Shelburne, Vermont. This study provides the Town a comprehensive resource that synthesizes the Town’s more than 20 plans and studies completed over the years and their 30 individual project recommendations.
Consultant:
DuBois & King Inc.
Geography:
Shelburne

Richmond Road Pedestrian and Bicycle Scoping Study — Cost Update and Segments

283.1 kB
Year:
2022
Theme:
Bicycle & Pedestrian, Bike/Ped
Description:
This project was an update to the 2017 evaluation and preferred alternative selection on ways to improve walking and cycling along this 1.7 mile corridor in Hinesburg. For this update the consultant identified how to break the path into segments with cost estimates for each as a way for the Town to seek design/construction funding.
Consultant:
Toole Design Group
Geography:
Hinesburg

Underhill Roadway Safety Analysis: Pleasant Valley Road and Irish Settlement Road

13 MB
Year:
2021
Theme:
Bike, Bike/Ped, Bike/Pedestrian, Safety
Description:
The safety review presented in this report includes two roadways in Underhill, VT being considered as designated bicycle routes. These roadways are the entire length of Irish Settlement Road and a segment of Pleasant Valley Road. These two roads serve as potential bicycle route connections between Underhill Center and Vermont Route 15 in Cambridge, VT, a popular cycling route in the state.
Consultant:
VHB
Geography:
Underhill

Lake Street Pedestrian Streetscape and Stormwater Feasibility Study

10 MB
Year:
2020
Theme:
Bike/Ped, Bike/Pedestrian, Stormwater
Description:
Lake Street in Burlington is a shared use street that connects the City core to the northern waterfront. There are two mid-block pedestrian crossings on this segment. The road is landscaped with street trees and granite blocks. Stormwater runoff sheet flows across the road from east to west. Runoff from nearby properties drains over Lake Street at the driveway intersections. Most of the stormwater sheet flows into small swales or ponds in the nearest low spot. The City with funding from the CCRPC studied possible pedestrian, streetscape and stormwater improvements for Lake Street in the project area.
Consultant:
Stantec
Geography:
Burlington

Malletts Bay Transportation and Stormwater Scoping Report – Appendix

16.9 MB
Year:
2017
Theme:
Bike/Ped, Intersection, Stormwater, Transportation
Description:
This scoping study identifies and evaluates alternatives that address stormwater management, bicycle and pedestrian accommodations along West Lakeshore Drive, and improvements at the Blakely Road and Lakeshore Drive intersection
Consultant:
Aldrich & Elliot, Stone Environmental, Third Sector Associates, Vanasse Hangen & Brustlin Inc.
Geography:
Colchester

Malletts Bay Stormwater Management System & Transportation Scoping Study

9.8 MB
Year:
2017
Theme:
Bike, Bike/Ped, Intersection, Pedestrian, Stormwater, Transportation
Description:
This scoping study identifies and evaluates alternatives that address stormwater management, bicycle and pedestrian accommodations along West Lakeshore Drive, and improvements at the Blakely Road and Lakeshore Drive intersection.
Consultant:
Aldrich & Elliot, Stone Environmental, Third Sector Associates, Vanasse Hangen & Brustlin Inc.
Geography:
Colchester

ATP Appendices

5.8 MB
Year:
2017
Theme:
Bike/Ped
Description:
Appendices A through J
Consultant:
Toole Design Group
Geography:
Chittenden County