Search Studies and Reports:

Reset All

VT 116 Patrick Brook Culvert Assessment Study – Hinesburg

2.8 MB
Year:
2025
Theme:
Bridges and Culverts, Stormwater
Description:
This study analyzed the existing condition of three culverts in Hinesburg; 1) the Patrick Brook Culvert condition across VT 116, located 500 ft north of Commerce Street, 2) a culvert across VT 116 located just north of Buck Hill Road and 3) a culvert located under Buck Hill Road.  Assessments were conducted to determine the bank full width and ordinary high-water-mark of Patrick Brook and other drainage above and below the culvert. This project developed 10% level conceptual plan and cost estimate for each culvert location and provided basic verification of engineering feasibility and structure size based on the Hydraulic and Hydrology (H&H) analysis.
Consultant:
Watershed Consulting Associates
Geography:
Hinesburg

Huntington Bridges and Culverts Maintenance Plan

41.1 MB
Year:
2021
Theme:
Bridges and Culverts, Capital Improvement Plan
Description:
The Town of Huntington with assistance from the Chittenden County Regional Planning Commission (CCRPC) evaluated the current condition of Town bridges and culverts, and developed an infrastructure improvement plan.  The purpose of this plan is to develop a planning tool for the Town to maintain an overall satisfactory/or better transportation network by repairing, replacing or preserving infrastructure on a programmed schedule, and increase condition ratings of structures and to inform the annual municipal budget for bridges and culverts maintenance.
Consultant:
McFarland-Johnson
Geography:
Huntington