Search Studies and Reports:

Reset All

Evaluation of Statewide Park & Ride Facilities ~ Final Report

3.6 MB
Year:
1991
Theme:
Infrastructure, Park and Ride, Parking, Survey, Transportation
Description:
The Vermont Agency of Transportation commissioned a statewide evaluation of the existing park and ride facilities. This study includes an appraisal of existing facilities and development of strategies to improve the park and ride system.
Consultant:
TAMS Consultants Inc.
Geography:
State

Chittenden County Regional Bicycle Plan

1.8 MB
Year:
1988
Theme:
Bicycle & Pedestrian, Infrastructure, Transportation
Description:
The conclusions and recommendations reached in this plan draw on an inventory of existing and proposed bicycle facilties focussing on the nine MPO communities (Burlington, Colchester, Essex, Essex Junction, Milton, Shelburne, South Burlington, Williston and Winooski). Data on facilities were collected by contact with town planners, recreation directors and street department superintendents in combination with field surveys of existing facilities throughout the county.
Consultant:
(none)
Geography:
Chittenden County

Chittenden County Bus Stop Location & Design Study

2.3 MB
Year:
1988
Theme:
Bicycle & Pedestrian, Bus, Infrastructure, Transit, Transportation
Description:
This report presents general guidelines and recommendations for efficient location and design of bus stops. A literature search and field survey of CCTA bus stops was used to develop this summary of recommended practices and procedures.
Consultant:
(none)
Geography:
Chittenden County

Interstate Route Studies through the Greater Burlington Area

59.2 MB
Year:
1976
Theme:
Corridor, Infrastructure, Interstate, Traffic, Transportation
Description:
This report is concerned with the specific alignment of a small portion of the entire Interstate network in Vermont and will of necessity discuss the local as well as the national aspects. The recommended plan will furnish access to the Interstate network for traffic generated in the Area and provide quick and safe routes for interstate traffic which has this Area as its destination. In addition, this plan will relieve local traffic and provide a by-pass route for traffic to pass through to other regions. This is in accordance with the statement contained in the Federal Highway Act of 1956; That local needs to the extent practicable, suitable and feasible be given equal consideration with the needs of interstate commerce...
Consultant:
Boswell Engineering Company Consultants
Geography:
Burlington, Chittenden County, Colchester, Essex, Essex Junction, South Burlington, State, Winooski

Dorset Street & Williston Road Intersection Access Analysis

573 kB
Year:
1976
Theme:
Infrastructure, Intersection, Technical Assistance, Traffic, Transportation
Description:
Site plan review for the South Burlington Planning Commission for a proposed 172 unit motel-restaurant-lounge complex on the Lamplough property at the intersection of Dorset St. and Williston Rd.
Consultant:
(none)
Geography:
South Burlington