East Road / Depot Road Technical Assistance

522.9 kB
Year:
2002
Theme:
Infrastructure, Intersection, Safety, Technical Assistance, Transportation
Description:
Technical Assistance study intending to address crashes at or near the intersection of East Road and Depot Road in Colchester, Vermont
Consultant:
Donald L. Hamlin Consulting Engineers Inc.
Geography:
Colchester

Burlington Multimodal Transportation Center

5.1 MB
Year:
2001
Theme:
Infrastructure, Intersection, Parking, Transit, Transportation
Description:
The consultant was commissioned to study the feasibility of a waterfront transportation center/mixed-use joint development project. The purpose of this study was to identify and evaluate potential sites for the facility, and to make final recommendations regarding the prefered site, the overall feasibility of the project, the potential costs and funding sources for the project, and implementation strategies.
Consultant:
Wallace Floyd Associates Inc.
Geography:
Burlington

VT Route 2A Initial Scoping Report

33.5 MB
Year:
2001
Theme:
Corridor, Intersection
Description:
This study examines potential improvement to Route 2A in the Towns of Essex and Colchester, between its intersection with VT289 at the southern end and US Route 7 at the northern end. The study includes evaluation of the intersection of Route 2A with Mill Pond Road and East Road
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester, Essex

Spear Street & Lime Kiln Road: Intersection Study

3 MB
Year:
2000
Theme:
Intersection, Technical Assistance, Traffic, Transportation
Description:
The intersection of Spear Street & Lime Kiln Road in the Town of Charlotte been identified as a substandard intersection by the town. This intersection is located at the top of a hill and has inadequate sight distances. The purpose of this study is to explore cost effective ways to improve the intersection.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Charlotte

Mary Street & Williston Road Intersection Alternatives Analysis

383 kB
Year:
2000
Theme:
Infrastructure, Intersection, Technical Assistance, Traffic, Transportation
Description:
This technical memorandum summarizes the results of the Mary Street project access and roadway alternatives. The memo describes the approach to the analysis, results, and conclusions regarding each alternative.
Consultant:
(none)
Geography:
South Burlington

U.S. Route 7 and Rebecca Lane Drive Intersection Upgrade (updated in 2004 as Milton High School Access Improvements)

26.7 MB
Year:
1998
Theme:
Bicycle & Pedestrian, Intersection, Safety, Schools, Signal, Traffic
Description:
The purpose of the U.S.Route 7 and Rebecca Lander Drive Intersection Upgrade study was to identify existing deficiencies and concerns regarding High School access and recommend a solution that better serves the needs of the users. This study was put on hold pending development of additional information and was updated in 2004.
Consultant:
Webster-Martin Consulting Engineers
Geography:
Milton

I-89/Hinesburg Road Off-Ramp Conceptual Design Report

1.9 MB
Year:
1996
Theme:
Corridor, Intersection, Traffic, Transportation
Description:
The Chittenden County area of Vermont is continuing to experience commercial, industrial and residential growth, much of which is occurring in the City of South Burlington. The City has zoned most of the area to the northeast of the VT 116 overcrossing of I-89 for mixed commercial and industrial use. This area has seen the demise of the former Digital Plant and its subsequenpt artial revival. Most of the potential of this areah as not been realizedbecauseo f a lack of access. To remedy this, the City has undertaken two initiatives. The first is an interchange from I-89 to VT 116 and the second,s ome local accessin to the arean ear Technology Park (the former Digital Plant).
Consultant:
DuBois & King Inc.
Geography:
South Burlington

Interstate 89 Exit 14W Southbound Ramp Congestion Study ~ Initial Scoping Report

1.2 MB
Year:
1993
Theme:
Intersection, Interstate, Safety, Transportation
Description:
The impetus for initiating this project is due to an unsafe condition which has developed during the morning peak hour traffic period between approximately 7:30 a.m. and 8:30 a.m. at this I-89 Interchange ramp west bound towards Burlington (Ramp C). This study is to determine the causes of, and possible solutions to the long queue that develops, creating a back-up in the travel lanes on I-89.
Consultant:
Pinkham Engineering Associates Inc.
Geography:
Burlington, South Burlington

Dorset Street & Williston Road Intersection Access Analysis

573 kB
Year:
1976
Theme:
Infrastructure, Intersection, Technical Assistance, Traffic, Transportation
Description:
Site plan review for the South Burlington Planning Commission for a proposed 172 unit motel-restaurant-lounge complex on the Lamplough property at the intersection of Dorset St. and Williston Rd.
Consultant:
(none)
Geography:
South Burlington