Search Studies and Reports:

Reset All

Assessment of Critical Non-Compliant Sidewalks, Paths, and Crossings

5.7 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Bike and Ped, Recreation, Safety, Sidewalk, Technical Assistance
Description:
In the Vermont communities of Essex and Essex Junction sidewalks, driveways, and intersection crossing infrastructure may be deficient, with ADA ramps, deteriorating sidewalk or pathways creating travel impairments, and signalized intersections that may not meet these requirements. State and federal laws and regulations require local governments to ensure that people with disabilities have full access to civic life within their communities. The purpose of the Assessment of Critical Non-Compliant Sidewalks, Paths, and Crossings is to assess, analyze, and develop a prioritization list of improvements to sidewalks, driveways, and intersections at identified study focus areas within the Town of Essex and Village of Essex Junction, Vermont.
Consultant:
Toole Design Group
Geography:
Essex, Essex Junction

Shelburne Gateway Scoping Study

15.4 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Safety, Traffic Calming, Transportation
Description:
This scoping study identifies and evaluates alternatives to create a gateway into Shelburne on US 7 from the south with specific attention to pedestrian safety and mobility.
Consultant:
DuBois & King Inc.
Geography:
Shelburne

Essex Junction Train Station Access and Circulation Study

13.4 MB
Year:
2015
Theme:
Infrastructure, Safety, Traffic, Transit
Description:
This Scoping Study evaluating possible improvements to the Amtrak Train Station in Essex Junction and evaluated access and circulation improvements in the station area.
Consultant:
Resource Systems Group Inc.
Geography:
Essex Junction

Interstate 89 – Exit 17 Scoping Study

15.7 MB
Year:
2014
Theme:
Intersection, Interstate, New Capacity, Regional Planning, Safety, Signal, Traffic, Transportation
Description:
The Exit 17 Scoping Study was initiated in the spring of 2013 through its inclusion in the Chittenden County Regional Planning Commission’s (CCRPC) Unified Planning Work Program (UPWP). The focus of this scoping study was to develop and evaluate build alternatives for relieving congestion, increasing safety, and improving bicycle conditions at the I-89 Exit 17 interchange and adjacent intersection of US 2 and US 7—locally known as Chimney Corners—near the Colchester/Milton town line in Chittenden County, Vermont.
Consultant:
Parsons Brinckerhoff
Geography:
Chittenden County, Colchester, Federal, Milton, State

South Burlington Parks Access Improvement Study

3.2 MB
Year:
2014
Theme:
Bicycle & Pedestrian, Environment, Municipal Planning, Parking, Parks, Recreation, Safety
Description:
In 2014, at the City’s request, the CCRPC hired Stantec to undertake an assessment of public places through the lens of the Americans with Disabilities Act (ADA). The report focused on the City’s parks – their facilities, grounds, as well as parking areas.
Consultant:
Stantec
Geography:
South Burlington

East Charlotte Village and Spear St Speed Study

1.8 MB
Year:
2013
Theme:
Safety, speed study
Description:
This study evaluated existing road conditions and travel behavior of motorists along Spear Street and near the East Charlotte village area.  This study provided recommendations for a preferred speed limit and potential traffic measures within the study area.
Consultant:
(none)
Geography:
Charlotte

Laker Lane Scoping Study

3.4 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Laker Lane Scoping Study – Appendices

4.5 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Blakely Road / Laker Lane Scoping Study

3.4 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Blakely Road / Laker Lane Scoping Study – Appendices

4.5 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester