Search Studies and Reports:

Reset All

Truck Network Analysis: Vehicle Related Criteria

3.9 MB
Year:
1999
Theme:
Freight, Infrastructure, Safety, Transportation, Truck
Description:
The Vermont Agency of Transportation is providing this report to ensure that the best information available has been compiled and analyzed to provide a solid foundation for the discussion on commercial vehicle size. The Truck Network Analysis and the CVEST Final Report are intended to provide a framework for development of the Vermont commercial vehicle policy.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
State

U.S. Route 7 and Rebecca Lane Drive Intersection Upgrade (updated in 2004 as Milton High School Access Improvements)

26.7 MB
Year:
1998
Theme:
Bicycle & Pedestrian, Intersection, Safety, Schools, Signal, Traffic
Description:
The purpose of the U.S.Route 7 and Rebecca Lander Drive Intersection Upgrade study was to identify existing deficiencies and concerns regarding High School access and recommend a solution that better serves the needs of the users. This study was put on hold pending development of additional information and was updated in 2004.
Consultant:
Webster-Martin Consulting Engineers
Geography:
Milton

The Traffic Calming Pilot Study for a Neighborhood in Burlington’s Old North End

3.1 MB
Year:
1993
Theme:
Infrastructure, Safety, Speed, Traffic, Transportation
Description:
This study is part of a four part Traffic Engineering and Transportation Planning Services effort including: a Traffic Calming Strategy for the Burlington Old North End, a City Wide study for Development of Truck Routes, a Revision of the Downtown Parking Study, and a Regional Congestion Management Strategy.
Consultant:
Resource Systems Group Inc., T.J. Boyle & Associates
Geography:
Burlington

The Traffic Calming Manual: Chittenden County Regional Planning Commission, Vermont

2.1 MB
Year:
1993
Theme:
Bicycle & Pedestrian, Safety, Speed, Traffic, Transportation
Description:
This study is part of a four part Traffic Engineering and Transportation Planning Services effort including: 1. Traffic Calming Strategy for the Burlington Old North End, 2. City Wide Study for Development of Truck Routes, 3. Revision of the Downtown Parking Study, 4. Regional Congestion Management Strategy. This manual focuses on neighborhood traffic calming with a brief discussion on safety of pedestrians when crossing arterials. It includes a discussion on the Traffic Calming Planning Process, Warrants for Traffic Calming, and descriptions of the Traffic Calming Devices.
Consultant:
Resource Systems Group Inc., T.J. Boyle & Associates
Geography:
Chittenden County

Interstate 89 Exit 14W Southbound Ramp Congestion Study ~ Initial Scoping Report

1.2 MB
Year:
1993
Theme:
Intersection, Interstate, Safety, Transportation
Description:
The impetus for initiating this project is due to an unsafe condition which has developed during the morning peak hour traffic period between approximately 7:30 a.m. and 8:30 a.m. at this I-89 Interchange ramp west bound towards Burlington (Ramp C). This study is to determine the causes of, and possible solutions to the long queue that develops, creating a back-up in the travel lanes on I-89.
Consultant:
Pinkham Engineering Associates Inc.
Geography:
Burlington, South Burlington

Study For The Development of Truck Routes : City of Burlington, Vermont

1.1 MB
Year:
1993
Theme:
Freight, Safety, Transportation, Truck
Description:
This study was intended to assist the City of Burlington develop an overall plan of existing thru-truck routes within, a truck traffic management strategy for the City, a set of recommendations regarding truck weight enforcement, and recommendations for thru-truck regulatory signs to assist in the guidance of truck operators to designated thru-truck routes.
Consultant:
FitzPatrick-Lleweeln Inc.
Geography:
Burlington

U.S. Route 7 ~ Town of Milton: Traffic Engineering-Transportation Planning Assistance Project

1.2 MB
Year:
1989
Theme:
Modeling, Safety, Technical Assistance, Traffic, Transportation
Description:
This memorandum summarizes the findings and recommendations for the examination of locations along U.S. Route 7 in the Town of Milton. This document reflects comments received from the Town and the client, the Chittenden County Regional Planning Commission (CCRPC), at a preliminary briefing, and is accompanied by four scaled aerial photograph plan sheets depicting the recommendations. The memorandum is organized by the four locations examined along U.S. Route 7 intersections with: 1. Lake Road, 2. Main Street, 3. Middle Road/Railroad Street Extension, and 4. West Milton Road/Racine Road. Each of the locations is discussed below beginning with a description of existing conditions and observed problems.
Consultant:
JHK & Associates
Geography:
Milton