Right of Way Condition Inventory for Stormwater Management, Phase II – Wards 2&3, City of Burlington, Vermont

2.1 MB
Year:
2022
Theme:
Environment, Infrastructure, Storm Water, Stormwater
Description:
On behalf of Chittenden County Regional Planning Commission (CCRPC) and the City of Burlington (City), Stone Environmental, Inc. (Stone) completed in June 2022 a Right of Way Condition Inventory for Stormwater Management within Burlington Wards 2 and 3. A summary of the inventory and tasks completed are described below. Data from the project is in two web maps Soil Boring Status Map and BTV Soil and Utility ROW Assessment Map. See section 1. Introduction to click on embedded web links to these maps.
Consultant:
Stone Environmental
Geography:
Burlington

Winooski: Elm Street Stormwater Outfall Stabilization, Final Design

6.2 MB
Year:
2021
Theme:
Infrastructure, Storm Water, Stormwater
Description:
A stormwater outfall just southwest of Elm St drains into a ravine that flows into wetlands within the Winooski River floodplain. Flow from the outfall was dropping into a channel before draining into the ravine. The drop below the outfall is several feet, and, prior to retrofit, the channel surface was bare soil. As a result, flow from the outfall was eroding the channel, sending sediment into the ravine and the downstream wetlands. The goal of the project was to develop a final design to stabilize the channel with geotextiles and controlled fills and raise grades below the outfall to dissipate energy during flows. The project required building temporary access to the channel and associated temporary erosion control measures. The project will reduce erosion from the channel and reduce sedimentation of the downstream wetlands. NOTE: Using this design, the City then constructed this stabilization project in the fall of 2020 using a VTRANS Better Roads grant along with City funds.
Consultant:
Watershed Consulting Associates
Geography:
Winooski

Jericho: Bolger Hill Road Supplemental Study, May 2021

2.8 MB
Year:
2021
Theme:
Storm Water, Technical Assistance
Description:
The scope of the Bolger Hill Drainage Scoping project was to provide engineering services for the advancement to conceptual design (25%) of the Alternative #4 Design presented in the January 2020 Bolger Hill Road Drainage Alternatives Study. This project builds on that previous study that investigated drainage issues and evaluated improvement options for Bolger Hill Road in Jericho. A survey was conducted, and conceptual plans were drafted to more accurately develop a cost estimate for improvements to Bolger Hill Road. Further design aspects of the Bolger Hill Drainage Scoping project conceptual design are noted below. The Jericho Center Circle SW BMP Design project is not discussed further in this Design Narrative. The purpose of the project is to provide a roadway and drainage alternative that reduces the erosion that is currently occurring along Bolger Hill Road and to reduce the sediment accumulation at its intersection with Jericho Center Circle. The need for the project is to reduce the gravel, which comes from Bolger Hill Road, that gets washed into the Town Green and abutters properties after large storm events. The Town would also like to improve the water quality in this area.
Consultant:
Hoyle - Tanner & Associates
Geography:
Jericho

Right of Way Condition Inventory for Stormwater Management, Phase I – Wards 5&6 City of Burlington, Vermont

1.3 MB
Year:
2021
Theme:
Environment, Storm Water, Stormwater
Description:
On behalf of Chittenden County Regional Planning Commission (CCRPC) and the City of Burlington (City), Stone Environmental, Inc. (Stone) has completed the Right of Way Condition Inventory for Stormwater Management within Burlington Wards 5 and 6. A summary of the inventory and tasks completed are described below. Data from the project is in two web maps Soil Boring Status Map and BTV Soil and Utility ROW Assessment Map. These two maps can be accessed by viewing the embedded links in the paragraph titled 1. Introduction.
Consultant:
Stone Environmental
Geography:
Burlington

Bolger Hill Road, Jericho: Drainage Alternatives Study

9.4 MB
Year:
2020
Theme:
Storm Water, Stormwater
Description:
In accordance with the agreement between the Town of Jericho, the Chittenden County Regional Planning Commission (CCRPC), and Hoyle, Tanner & Associates, Inc., this Scoping Study - Technical Memo (Study) has been prepared to investigate four (4) alternatives for roadway drainage and erosion solutions for Bolger Hill Road within the existing roadway ROW and Town parcels. As this is a technical study, no public meeting was held, however the following general purpose and need statements has been developed based on our meeting with Town and CCRPC Staff. Purpose: The purpose for this Study is to provide roadway and drainage alternatives to reduce the erosion that is currently occurring along Bolger Hill Road and to reduce the sediment accumulation at its intersection with Jericho Center Circle. Need: The need for the project is to reduce the gravel, which comes from Bolger Hill Road, that gets washed into the Town Green and abutters properties after large storm events. The Town would like to improve the water quality in this area through the construction of Best Management Practices (BMPs) within this project.
Consultant:
Hoyle - Tanner & Associates
Geography:
Jericho

Lake Iroquois Recreation District, Williston: Beebe Lane Drainage Improvements, Final Design and Cost Estimate

4.1 MB
Year:
2019
Theme:
Infrastructure, Storm Water, Stormwater
Description:
This project developed Final Design Plans and a Cost Estimate for road and drainage improvements for Beebe Lane located within lands managed by the Lake Iroquois Recreation District within the Town of Williston.
Consultant:
KAS
Geography:
Williston

Town of Milton Stormwater Master Plan

1.2 MB
Year:
2019
Theme:
Storm Water, Stormwater
Description:
In 2018 the Chittenden County Regional Planning Commission (CCRPC) received grant funding from the Vermont Agency of Natural Resources (VTANR) Clean Water Initiative Program to supplement funds from the Town of Milton to develop a Stormwater Master Plan (SWMP) for Milton. Fitzgerald Environmental Associates, LLC (FEA) was hired by the Town and CCRPC in the summer of 2018 to develop the plan. This final SWMP report for the Town of Milton represents significant efforts and collaborations over the last year between the Town, FEA, CCRPC, VTANR, and other partners, including private landowners and business owners, interested in mitigating stormwater and improving water quality. The goal of this project was to identify and prioritize stormwater improvement projects throughout the Town, with a focus on Town owned properties. Project prioritization followed the Unified Scoring Metrics recently developed by VTDEC (2018a). Conceptual design plans (30% design) were prepared for 15 high-priority projects. Additional phosphorus loading and removal estimates were completed to assist the Town with planning for future efforts to prepare the Phosporus Control Plan.
Consultant:
Fitzgerald Environmental Associates
Geography:
Milton

Allen Brook Large Culvert Assessment Study

6.5 MB
Year:
2019
Theme:
Storm Water, Water Quality
Description:
This project extensively conducted culvert assessment on all large culverts (more than 5 ft) within the Allen Brook watershed in Williston.  The study focused on evaluating existing conditions of all six large culverts; four on Talcott Road (2 doubles), one on South Ridge Road and one on Old Stage Road, identifying regulations and permitting processes that may required for future culvert replacement/improvement and develop a long-term implementation plan including prioritizing, conceptual plans and cost estimates that will be included in the Town's Capital Improvement Plan.
Consultant:
Stone Environmental
Geography:
Williston

Town of Richmond Stormwater Master Plan

38.9 MB
Year:
2018
Theme:
Storm Water, Stormwater
Description:
The ultimate objective of this stormwater master planning project is to support the Town in improving stormwater management, by providing a list of high priority water resource concerns and conceptual solutions that support the development and implementation of future restoration projects in an efficient and targeted manner. This Stormwater Master Plan first incorporates information from existing plans and datasets to create a single, town-specific resource to guide future stormwater management activities. The resulting stormwater management planning information and resources are included in Section 2 of this report. This Stormwater Master Plan also:  Provides a means for comparing anticipated benefits of individual stormwater improvement projects;  Provides recommendations to address stormwater problems, including a prioritized list of problem areas that can assist the Town in directing resources to high priority projects; and  Presents conceptual solutions for stormwater management measures in select high priority problem areas.
Consultant:
Stone Environmental
Geography:
Richmond

Town of Underhill Stormwater Master Plan

12.3 MB
Year:
2018
Theme:
Storm Water, Stormwater
Description:
The intent of this report is to present the data collected, evaluations, analyses, designs, and cost estimates for subwatersheds in Underhill under a contract between the Chittenden County Regional Planning Commission and Watershed Consulting Associates, LLC. Funding for the project was provided by a Vermont Department of Environmental Conservation, Clean Water Fund grant. The plan presented is intended to provide the watershed’s stakeholders a means by which to identify and prioritize future stormwater management efforts. This planning study presents a recommended collection of Best Management Practices (BMPs) that would address specific concerns that have been raised for these areas. In particular, there is great need to reduce stormwater impacts including phosphorus and sediment from stormwater runoff to receiving waters within the Town and the greater Lake Champlain Basin in light of future regulation under the Lake Champlain Total Maximum Daily Load requirements. Although there are other BMP strategies that could be implemented in the watershed, these are the sites and practices that project stakeholders believe will have the greatest impact and probability of implementation. These practices do not represent a regulatory obligation, nor is any property owner within the watershed obligated to implement them. This stormwater master plan, and therefore its resultant strategies, will be one of the actions in the Lamoille Tactical Basin Plan. This will put the BMP strategies in queue for state funding for implementation.
Consultant:
Watershed Consulting Associates
Geography: