Search Studies and Reports:

Reset All

CarShare VT Market Study Update and Feasibility Study

9 MB
Year:
2013
Theme:
Technical Assistance, Transportation Demand Management
Description:
This study summarizes and updates the 2008 Market Study for Burlington, compares the findings with CarShare VT utilization data, examines the 2012 CarShare VT Member Survey, and applies this information to assess the feasibility of locating a car-share pod in Montpelier, Essex Junction and Williston.
Consultant:
Resource Systems Group Inc.
Geography:
Essex Junction, Williston

Lamplite Acres Greenstreets Study

13.4 MB
Year:
2012
Theme:
Environment, Storm Water, Technical Assistance
Description:
This project investigated the feasibility of using “Green Streets” stormwater retrofits to alleviate or reduce surface stormwater ponding in the Lamplite Acres neighborhood in Williston. Flooding on the roads is common and creates slippery and potentially dangerous roadway conditions. Green Street improvements considered in this study include infiltration trenches, streetside rain gardens, stormwater curb extensions, streetside rain gardens, and permeable surfaces.
Consultant:
(none)
Geography:
Williston

Vermont 116 Culvert AOP Project

21.8 MB
Year:
2012
Theme:
Environment, Storm Water, Technical Assistance
Description:
Vermont Route 116 in Starksboro and Hinesburg is slated for re-paving by the Vermont Agency of Transportation (VTrans) in 2013. This pilot project, led by the Addison and Chittenden County Regional Planning Commissions, injects aquatic organism passage (AOP) assessment and design into the planned culvert replacements on Vermont 116. The primary objective of this project is to identify structures where subtle and inexpensive design changes such as small increases to pipe size or re-setting of the culvert can improve fish passage so that these changes can be readily incorporated into planned culvert replacements. The ultimate goal of this work is to incorporate fish passage improvements into regular paving operations around the state.
Consultant:
Milone & Macbroom Inc.
Geography:
Hinesburg

Huntington Main Road Pavement Evaluation Study

6.7 MB
Year:
2012
Theme:
Infrastructure, Pavement, Technical Assistance, Transportation
Description:
The Town of Huntington owns and maintains Main Road, running from the Richmond Town Line to the Buel’s Gore Line. This study documents a roadway condition evaluation of Main Rd to assess the costs for the town maintainance in the short (5 year) and long term (20 year) time frames. The document summarizes the inventory, geotechnical borings, maintenance history, estimated repair and maintenance costs, and proposed maintenance strategies.
Consultant:
DuBois & King Inc.
Geography:
Huntington

Speed Analysis & Traffic Counts within the vicinity of River Road

1.8 MB
Year:
2011
Theme:
Infrastructure, Safety, Speed, Technical Assistance, Traffic, Transportation
Description:
At the request of the Town of Colchester, CCRPC conducted three traffic counts in the vicinity of River Road & Red Oak Drive, at the location of a crash incident which occurred during August of 2011
Consultant:
(none)
Geography:
Colchester

Town of Williston Pavement Management Study

1.6 MB
Year:
2011
Theme:
Infrastructure, Pavement, Technical Assistance, Transportation
Description:
Pavement condition study for the Town of Williston covering the year 2010-2011.
Consultant:
(none)
Geography:
Williston

Multi-way Stop Analysis for Woods Hollow Rd. Intersections (Phelps Rd. & Maple Tree Ln.)

61.6 kB
Year:
2011
Theme:
Infrastructure, Safety, Technical Assistance, Traffic, Transportation, Warrant Analysis
Description:
2011 Review of multi-way stop warrants for the Woods Hollow Road & Phelps Rd. intersection, and Woods Hollow Rd. & Maple Tree Lane. The 2009 MUTCD Multiway Stop criteria are not met.
Consultant:
(none)
Geography:
Westford

US 7/Marsett Road/Bostwick Road Intersection Safety Analysis

2.1 MB
Year:
2011
Theme:
Infrastructure, Intersection, Safety, Technical Assistance, Traffic, Transportation
Description:
The Town of Shelburne requested the Chittenden County Metropolitan Planning Organization’s (CCMPO) assistance in reviewing and analyzing the crash history at the US 7 /Marsett Road/Bostwick Road intersection. The Shelburne Police have seen an increase in the number of crashes over the past year and would like to determine possible causes and mitigation strategies.
Consultant:
(none)
Geography:
Shelburne