Year:
2025
Theme:
Bicycle & Pedestrian, Housing, Infrastructure, Land Use, Municipal Planning, Park and Ride, Traffic
Description:
The East and West Villages Project is an examination of the potential for future growth and development and multimodal transportation in Charlotte’s villages, informed by prior planning efforts and community input.
Consultant:
DuBois & King Inc.
Geography:
Charlotte
Year:
2023
Theme:
Land Use, Modeling, Traffic, Transportation
Description:
As the City of South Burlington contemplates the phasing of anticipated development and long planned connections through the newly established City Center area, understanding the potential traffic redistribution and transportation infrastructure improvements that may be required is key to planning transportation in the area. An evaluation of the transportation implications of new development and new connector roadways within City Center was conducted to identify transportation infrastructure and investments necessary to support growth in City Center.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
South Burlington
Year:
2020
Theme:
Bicycle & Pedestrian, Intersection, Park and Ride, Safety, Traffic, Transportation
Description:
This study developed and identified a recommended alternative for the Richmond Road, North Road, and Texas Hill Road intersection that improves the safety and comfort of the traveling public and nearby residents of Hinesburg.
Consultant:
DuBois & King Inc.
Geography:
Hinesburg
Year:
2020
Theme:
Bicycle & Pedestrian, Traffic, Transportation
Description:
This memorandum summarizes the feasibility of continuing bicycle lanes through the intersections of Williston Road at Kennedy Drive/Airport Drive and Williston Road at Hinesburg Road/Patchen Road by reallocating roadway space used by vehicles.
Consultant:
Toole Design Group
Geography:
South Burlington
Year:
2020
Theme:
Bicycle & Pedestrian, Corridor, Infrastructure, Intersection, Safety, Traffic
Description:
The East Allen Street Gateway Enhancements Scoping Study examines the East Allen Street (Vermont Route 15) corridor from the Winooski Circulator east through the I-89 interchange to Roland Court to identify a suite of transportation and streetscape recommendations that improve safety and enhance accommodations for all modes along this important gateway into Winooski.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Winooski
Year:
2019
Theme:
Impact Fee, Technical Assistance, Traffic, Transportation
Description:
This impact fee study report outlines the future growth anticipated for the Town of Williston and documents the basis for implementing a transportation impact fee to pay for additional capacity associated with the increased demand for transportation mobility while conforming to the conditions imposed by 24 V.S.A., Chapter 131.
Consultant:
Resource Systems Group Inc.
Geography:
Williston
Year:
2019
Theme:
Intersection, Safety, Technical Assistance, Traffic
Description:
This report examines realigning the sidewalk on the east side of VT-116 across the Lantman's exit with the intent of changing the signal phasing of the side streets from split to concurrent as a means to reduce congestion through Hinesburg Village.
Consultant:
Vanasse Hangen & Brustlin Inc.
Geography:
Hinesburg
Year:
2019
Theme:
Bicycle & Pedestrian, Traffic, Transportation
Description:
The Chittenden County Regional Planning Commission (CCRPC) and the City of South Burlington (the City) initiated this study to analyze and evaluate the feasibility of mid-block crossings in multiple locations in South Burlington, Vermont.
Consultant:
Toole Design Group
Geography:
South Burlington
Year:
2019
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This is a scoping report for the intersections of Colchester Avenue, Riverside Avenue, Barrett Street, and Mill Street located in Burlington. It was conducted and coordinated with a separate scoping study of the adjacent Winooski River Bridge.
Consultant:
Hartgen Archaeological Associates, MTJ Roundabout Engineering, Stantec
Geography:
Burlington
Year:
2018
Theme:
Traffic, Transportation
Description:
This analysis evaluated the MUTCD guidance, commonly referred to as warrants, as it pertains to the installation of multi-way stop control at the intersection of North Williston Road and Mountain View Road. It can also be found as an appendix to the North Williston Road Scoping Study.
Consultant:
Resource Systems Group Inc.
Geography: