Search Studies and Reports:

Reset All

Exit 12/VT 2A Final Scoping Report

13.4 MB
Year:
2014
Theme:
Corridor, Traffic, Transportation
Description:
This Exit 12 & VT 2A Scoping Study carries forward the WENTS reccomendations to further investigate and refine transportation alternatives that address existing and projected traffic congestion; enhance safety for all users; improve bike-pedestrian connections from areas South of the interchange to the existing network North of the interchange; and advance economic growth in the area.
Consultant:
Resource Systems Group Inc.
Geography:
Williston

Crescent Connector Project: Environmental Assessment

24 MB
Year:
2014
Theme:
Corridor, Traffic, Transportation
Description:
The Environmental Assessment (EA) identifies, analyzes and discusses the potential environmental, cultural, and socioeconomic effects associated with the construction of the Crescent Connector Project in the Village of Essex Junction, Vermont.
Consultant:
DuBois & King Inc., Resource Systems Group Inc.
Geography:
Essex Junction

Route 116 Corridor Study

13.3 MB
Year:
2014
Theme:
Corridor, Traffic, Transportation
Description:
(none)
Consultant:
(none)
Geography:
Hinesburg

VT 2A Scoping Study – Industrial Avenue / Mountain View Road to River Cove Road

2 MB
Year:
2014
Theme:
Bicycle & Pedestrian, Corridor, Traffic
Description:
This Scoping Study evaluated alternative strategies to address existing and expected future travel demands at the VT2A/Industrial Avenue/Mountain View Road intersection and along VT2A north to River Cove Road.
Consultant:
Stantec
Geography:
Williston

Laker Lane Scoping Study

3.4 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

West Lakeshore Drive / Prim Road – Intersection Scoping Study – Appendices

4.4 MB
Year:
2013
Theme:
Intersection, Safety, Traffic, Transportation
Description:
This scoping study evaluated alternatives concerning the intersection of West Lakeshore Drive and Prim Road.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Laker Lane Scoping Study – Appendices

4.5 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Blakely Road / Laker Lane Scoping Study

3.4 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester

Blakely Road / Laker Lane Scoping Study – Appendices

4.5 MB
Year:
2013
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This Scoping Study evaluated alternatives concerning the intersection of Blakely Road and Laker Lane.
Consultant:
Lamoureaux & Dickinson Consulting Engineers Inc.
Geography:
Colchester