South Burlington Bike Lane Feasibility at Williston Road/Hinesburg Road and Kennedy Drive

3.9 MB
Year:
2020
Theme:
Bicycle & Pedestrian, Traffic, Transportation
Description:
This memorandum summarizes the feasibility of continuing bicycle lanes through the intersections of Williston Road at Kennedy Drive/Airport Drive and Williston Road at Hinesburg Road/Patchen Road by reallocating roadway space used by vehicles.
Consultant:
Toole Design Group
Geography:
South Burlington

Williston Transportation Impact Fee Study

1.3 MB
Year:
2019
Theme:
Impact Fee, Technical Assistance, Traffic, Transportation
Description:

This impact fee study report outlines the future growth anticipated for the Town of Williston and documents the basis for implementing a transportation impact fee to pay for additional capacity associated with the increased demand for transportation mobility while conforming to the conditions imposed by 24 V.S.A., Chapter 131.

Consultant:
Resource Systems Group Inc.
Geography:
Williston

Densmore Drive Culverts Scoping Study

1.3 MB
Year:
2019
Theme:
Stormwater, Transportation, Water Quality
Description:
The CCRPC selected Watershed Consulting Associates (WCA) for initial scoping, assessment, alternatives analysis, and 30% design development for the replacement of two (2) culverts on Densmore Drive in Essex Junction, VT.
Consultant:
Watershed Consulting Associates
Geography:
Essex Junction

Chittenden County Shared Mobility Regional Analysis

8.5 MB
Year:
2019
Theme:
Bicycle & Pedestrian, bikesharing, shared mobility, Transportation
Description:
Greenride Bikeshare launched in April 2018 and provided a new public transportation option in Burlington, South Burlington and Winooski. CCRPC contracted with Toole Design to analyze the potential future expansion of the Greenride system and provide guidance on the placement of additional micromobility hubs and options such as e-assist bicycles and e-scooters that may support the growth and success of the region’s first shared mobility system.
Consultant:
Toole Design Group
Geography:
Burlington, Chittenden County, South Burlington, Winooski

Concepts for Crossings on Williston Road and Kennedy Drive

4.5 MB
Year:
2019
Theme:
Bicycle & Pedestrian, Traffic, Transportation
Description:
The Chittenden County Regional Planning Commission (CCRPC) and the City of South Burlington (the City) initiated this study to analyze and evaluate the feasibility of mid-block crossings in multiple locations in South Burlington, Vermont.
Consultant:
Toole Design Group
Geography:
South Burlington

Colchester Avenue/Riverside Avenue Scoping Report

35.4 MB
Year:
2019
Theme:
Bicycle & Pedestrian, Intersection, Safety, Traffic, Transportation
Description:
This is a scoping report for the intersections of Colchester Avenue, Riverside Avenue, Barrett Street, and Mill Street located in Burlington. It was conducted and coordinated with a separate scoping study of the adjacent Winooski River Bridge.
Consultant:
Hartgen Archaeological Associates, MTJ Roundabout Engineering, Stantec
Geography:
Burlington

I-89 Exit 12 Transportation Improvement District (TID)

3.3 MB
Year:
2019
Theme:
Impact Fees, Municipal Planning, Transportation
Description:
The CCRPC worked alongside the Vermont Agency of Transportation (VTrans) and the Town of Williston to evaluate the feasibility of creating a Transportation Improvement District (TID) at the Exit 12/Taft Corners area in Williston, VT. In 2014, the Vermont General Assembly passed Act 145 (H.740) which establishes a Transportation Impact Fee that may be required by an Agency of Natural Resources District Environmental Commission (DEC) or by VTrans to help pay for transportation improvements that directly benefit proposed or future developments. One mechanism by which Transportation Impact Fees can be assessed is through a TID. RSG was retained by CCRPC to analyze and evaluate the potential TID in this area and identify a pathway toward implementation.
Consultant:
Resource Systems Group Inc.
Geography:
Williston

North Williston Road Scoping Study

20.8 MB
Year:
2018
Theme:
Bicycle & Pedestrian, Corridor, Infrastructure, Traffic Calming, Transportation
Description:

This scoping study identified and evaluated roadway cross section and traffic calming alternatives along North Williston Road from US Route 2 north to the Winooski River. It did not examine alternatives at intersections along the corridor as all major intersections were subjects of previous scoping studies.  A related document that came out of this study was the reanalysis of a multi-way stop control at the intersection of North Williston Road and Mountain View Road. This can be found in Appendix C and is also available as a stand-alone document in our Studies and Reports Database.

Consultant:
Resource Systems Group Inc.
Geography:
Williston

North Williston Rd/Mountain View Rd Multi-Way Stop Warrant Analysis

735.3 kB
Year:
2018
Theme:
Traffic, Transportation
Description:
This analysis evaluated the MUTCD guidance, commonly referred to as warrants, as it pertains to the installation of multi-way stop control at the intersection of North Williston Road and Mountain View Road. It can also be found as an appendix to the North Williston Road Scoping Study.
Consultant:
Resource Systems Group Inc.
Geography:
Williston

JERICHO RIVERSIDE STREET NETWORK MASTER PLAN

30.9 MB
Year:
2018
Theme:
Land Use, Transportation
Description:
The CCRPC and the Town of Jericho engaged in the planning and design of a street network concept in the Riverside area to facilitate multimodal safety and circulation, and encourage the redevelopment of the former sawmill property as a compact, walkable extension of the Riverside Village (also known as Jericho/Underhill Flats), a state-designated Village Center.
Consultant:
DuBois & King Inc.
Geography:
Jericho