Year:
2012
Theme:
Bridges, Infrastructure, Rail, Transportation
Description:
The purpose of this investigation was to conduct a structural assessment of the existing bridge, summarize its condition and determine appropriate repair options. On site assessment included sounding the soffit of the concrete arch as well as obtaining concrete cores for laboratory testing. Alternatives presented in this report are potential solutions for addressing concerns about the structural degradation of the existing arch bridge.
Consultant:
Stantec
Geography:
Winooski